A rerouted water line will be concealed above a ceiling. What should the foreman update now?
Correct Answer
C) The field record drawing or markup showing the changed route and location.
Concealed changes should be marked while the location is known.
Why This Is the Correct Answer
Concealed changes should be marked while the location is known.
Why the Other Options Are Wrong
Option A: Limit record drawing concealed line to the lunch order only
Choice A gives Only the lunch order. Its specific error: the option delays or omits the controlling step.
Option B: Base the record drawing concealed line response on the bid tab only
Choice B (Only the bid tab.) is rejected because the action skips the timing, documentation, or field-control step needed for Record drawing concealed line.
Option D: Apply nothing until warranty expiration to the record drawing concealed line condition
The trap in D is Nothing until warranty expiration. That selection is wrong because the option does not produce the required Record drawing concealed line outcome, The field record drawing or markup showing the changed route and location.
Memory Technique
Picture a gate on the jobsite; record drawing concealed line is solved by the action that leads to The field record drawing or markup showing the changed route and location.
Reference Hint
Open Construction Jobsite Management, 5th Ed. (2024); use by topic index - testing / inspections / acceptance to confirm that Concealed changes should be marked while the location is known.
More NASCLA Questions
Bid instructions require bid security with each sealed bid. Which purpose should the estimator associate with that requirement?
A wood deck surface has 320 sf of coverage. Boards have a 5-1/2 in. actual face width, and the order includes an 8 percent cutting allowance. What linear footage is closest?
Using the dimensions shown for the stabilized construction entrance, what is the plan area?
A reroof area requires 14,720 sf of rigid insulation. Boards are 4 ft by 8 ft, and the order includes 5 percent waste. How many boards are needed?
Two addenda revise the drawings before bid day. What must a responsive bidder normally do with those addenda?
A utility trench is 180 ft long, 3 ft wide, and 7 ft deep with vertical sides inside a trench shield. What excavation volume is required?
A 120 ft long Type C trench is cut with a 4 ft bottom width and a 6 ft depth. If side slopes are 1-1/2 horizontal to 1 vertical, what excavation volume is closest?
A storm pipe run needs 240 ft of bedding, 4 ft wide and 6 in. thick. Including a 10 percent ordering allowance, how many cubic yards of bedding aggregate are needed?
A mass excavation produces 1,180 loose cubic yards of material for off-site disposal. End-dump trucks can haul 18 loose cubic yards per trip. What truck count is required?
An asphalt-shingle roof has a slope of 3:12. Under the IBC low-slope asphalt-shingle provisions, what underlayment arrangement is required?
People Also Study
Business & Financial Management
120 questions Β· 70% to pass
Contract Administration
60 questions Β· 70% to pass
Project Management
60 questions Β· 70% to pass