Three submittals were returned in 6, 9, and 12 days. What was the average turnaround?
Correct Answer
A) 9 days
Average turnaround is (6 + 9 + 12) / 3 = 9 days.
Why This Is the Correct Answer
Average turnaround is (6 + 9 + 12) / 3 = 9 days.
Why the Other Options Are Wrong
Option B: 6 days
submittal turnaround average, choice a: the number 6 days comes from 6 but stops before the calculation reaches 9 days.
Option C: 10 days
submittal turnaround average, choice c: 10 days backs into 3.33 when divided by 3; the accepted setup gives 3 on that same base.
Option D: 27 days
submittal turnaround average, choice d: 6, + 9, + 12 gives 27 days. That calculation adds three listed values.
Memory Technique
Remember submittal turnaround average as "base, adjustment, final unit"; the last unit should read 9 days.
Reference Hint
Open Construction Jobsite Management, 5th Ed. (2024); use by topic index - documentation / submittals / RFIs / closeout to confirm that Average turnaround is (6 + 9 + 12) / 3 = 9 days.
More NASCLA Questions
Bid instructions require bid security with each sealed bid. Which purpose should the estimator associate with that requirement?
A wood deck surface has 320 sf of coverage. Boards have a 5-1/2 in. actual face width, and the order includes an 8 percent cutting allowance. What linear footage is closest?
Using the dimensions shown for the stabilized construction entrance, what is the plan area?
A reroof area requires 14,720 sf of rigid insulation. Boards are 4 ft by 8 ft, and the order includes 5 percent waste. How many boards are needed?
Two addenda revise the drawings before bid day. What must a responsive bidder normally do with those addenda?
A utility trench is 180 ft long, 3 ft wide, and 7 ft deep with vertical sides inside a trench shield. What excavation volume is required?
A 120 ft long Type C trench is cut with a 4 ft bottom width and a 6 ft depth. If side slopes are 1-1/2 horizontal to 1 vertical, what excavation volume is closest?
A storm pipe run needs 240 ft of bedding, 4 ft wide and 6 in. thick. Including a 10 percent ordering allowance, how many cubic yards of bedding aggregate are needed?
A mass excavation produces 1,180 loose cubic yards of material for off-site disposal. End-dump trucks can haul 18 loose cubic yards per trip. What truck count is required?
An asphalt-shingle roof has a slope of 3:12. Under the IBC low-slope asphalt-shingle provisions, what underlayment arrangement is required?