The safety manager verifies a construction-standard value: what is contractor quality control focused on?
Correct Answer
D) Checking and correcting work to meet contract requirements
Checking and correcting work to meet contract requirements is the correct meaning of quality control in this construction context for concept item 353. Other choices: the distractors describe unrelated administration, payment, or closeout ideas.
Why This Is the Correct Answer
Checking and correcting work to meet contract requirements is the correct meaning of quality control in this construction context for concept item 353.
Why the Other Options Are Wrong
Option A: Apply deleting inspections to the quality control condition
Choice A gives Deleting inspections. Its specific error: it points to Deleting inspections, but.
Option B: Base the quality control response on changing bid laws
Choice B (Changing bid laws) is rejected because it shifts the question into contract administration money flow.
Option C: Limit quality control to avoiding submittals
In general project requirements, Avoiding submittals is the wrong selection for Quality control: it leaves out the controlling Quality control result.
Memory Technique
Make quality control a purpose cue; if the choice changes the purpose, it cannot be Checking and correcting work to meet contract requirements.
Reference Hint
Open Construction Jobsite Management, 5th Ed.; use the index entry or section for "Quality control" to confirm that Checking and correcting work to meet contract requirements is the correct meaning of quality control in this construction context for concept item 353.
More NASCLA Questions
Bid instructions require bid security with each sealed bid. Which purpose should the estimator associate with that requirement?
A wood deck surface has 320 sf of coverage. Boards have a 5-1/2 in. actual face width, and the order includes an 8 percent cutting allowance. What linear footage is closest?
Using the dimensions shown for the stabilized construction entrance, what is the plan area?
A reroof area requires 14,720 sf of rigid insulation. Boards are 4 ft by 8 ft, and the order includes 5 percent waste. How many boards are needed?
Two addenda revise the drawings before bid day. What must a responsive bidder normally do with those addenda?
A utility trench is 180 ft long, 3 ft wide, and 7 ft deep with vertical sides inside a trench shield. What excavation volume is required?
A 120 ft long Type C trench is cut with a 4 ft bottom width and a 6 ft depth. If side slopes are 1-1/2 horizontal to 1 vertical, what excavation volume is closest?
A storm pipe run needs 240 ft of bedding, 4 ft wide and 6 in. thick. Including a 10 percent ordering allowance, how many cubic yards of bedding aggregate are needed?
A mass excavation produces 1,180 loose cubic yards of material for off-site disposal. End-dump trucks can haul 18 loose cubic yards per trip. What truck count is required?
An asphalt-shingle roof has a slope of 3:12. Under the IBC low-slope asphalt-shingle provisions, what underlayment arrangement is required?
People Also Study
Business & Financial Management
120 questions Β· 70% to pass
Contract Administration
60 questions Β· 70% to pass
Project Management
60 questions Β· 70% to pass