A civil foreman reviews the trench plan: a room closeout team verifies 10 rooms per day. If 104 rooms remain, how many whole days are required?
Correct Answer
C) 11 days
The calculation gives 11 days for the stated duration. Other choices: the distractors come from omitting an adjustment, using the wrong rate, or applying a rounded shortcut for calculation item 210.
Why This Is the Correct Answer
The calculation gives 11 days for the stated duration.
Why the Other Options Are Wrong
Option A: 10 days
duration, choice a: the answer choice lifts 10 days from the working line 104 / 10 = 10.4.
Option B: 12 days
duration, choice b: 12 days uses the wrong side of the schedule subtraction or omits one duration component.
Option D: 14 days
duration, choice d: 14 days uses the wrong side of the schedule subtraction or omits one duration component.
Memory Technique
Say the duration rule aloud as a chain; the chain ends at 11 days, not an intermediate stop.
Reference Hint
Open Construction Jobsite Management, 5th Ed.; use the index entry or section for "duration calculation" to confirm that The calculation gives 11 days for the stated duration.
More NASCLA Questions
Bid instructions require bid security with each sealed bid. Which purpose should the estimator associate with that requirement?
A wood deck surface has 320 sf of coverage. Boards have a 5-1/2 in. actual face width, and the order includes an 8 percent cutting allowance. What linear footage is closest?
Using the dimensions shown for the stabilized construction entrance, what is the plan area?
A reroof area requires 14,720 sf of rigid insulation. Boards are 4 ft by 8 ft, and the order includes 5 percent waste. How many boards are needed?
Two addenda revise the drawings before bid day. What must a responsive bidder normally do with those addenda?
A utility trench is 180 ft long, 3 ft wide, and 7 ft deep with vertical sides inside a trench shield. What excavation volume is required?
A 120 ft long Type C trench is cut with a 4 ft bottom width and a 6 ft depth. If side slopes are 1-1/2 horizontal to 1 vertical, what excavation volume is closest?
A storm pipe run needs 240 ft of bedding, 4 ft wide and 6 in. thick. Including a 10 percent ordering allowance, how many cubic yards of bedding aggregate are needed?
A mass excavation produces 1,180 loose cubic yards of material for off-site disposal. End-dump trucks can haul 18 loose cubic yards per trip. What truck count is required?
An asphalt-shingle roof has a slope of 3:12. Under the IBC low-slope asphalt-shingle provisions, what underlayment arrangement is required?