Temporary stairs serving the second floor are blocked by stored doors, leaving workers to climb through a window opening. What should the superintendent require?
Correct Answer
B) Clear and maintain a safe stairway or ladder access route
Safe access between work levels must be provided and maintained; blocked access should be corrected before workers improvise unsafe routes. Other choices accept a foreseeable access hazard.
Why This Is the Correct Answer
Safe access between work levels must be provided and maintained; blocked access should be corrected before workers improvise unsafe routes. Other choices accept a foreseeable access hazard.
Why the Other Options Are Wrong
Option A: The superintendent should use the window only during dry weather
Choice A gives Use the window only during dry weather. Its specific error: it leaves the work at an informal or incomplete stage, while Access and egress requires Clear and maintain a safe stairway or ladder access route.
Option C: Let each trade choose its own access path
In general project requirements, Let each trade choose its own access path is the wrong selection for Access and egress: it points to Let each trade choose its own access path, but.
Option D: The superintendent should wait until permanent stairs are installed
The trap in D is Wait until permanent stairs are installed. That selection is wrong because it tries to bypass the Access and egress checkpoint.
Memory Technique
Picture a inspection mark on the jobsite; access and egress is solved by the action that leads to Clear and maintain a safe stairway or ladder access route.
Reference Hint
Open 29 CFR 1926 OSHA Construction Standards; use 29 CFR 1926 Subpart X access requirements to confirm that Safe access between work levels must be provided and maintained; blocked access should be corrected before workers improvise unsafe routes.
More NASCLA Questions
Bid instructions require bid security with each sealed bid. Which purpose should the estimator associate with that requirement?
A wood deck surface has 320 sf of coverage. Boards have a 5-1/2 in. actual face width, and the order includes an 8 percent cutting allowance. What linear footage is closest?
Using the dimensions shown for the stabilized construction entrance, what is the plan area?
A reroof area requires 14,720 sf of rigid insulation. Boards are 4 ft by 8 ft, and the order includes 5 percent waste. How many boards are needed?
Two addenda revise the drawings before bid day. What must a responsive bidder normally do with those addenda?
A utility trench is 180 ft long, 3 ft wide, and 7 ft deep with vertical sides inside a trench shield. What excavation volume is required?
A 120 ft long Type C trench is cut with a 4 ft bottom width and a 6 ft depth. If side slopes are 1-1/2 horizontal to 1 vertical, what excavation volume is closest?
A storm pipe run needs 240 ft of bedding, 4 ft wide and 6 in. thick. Including a 10 percent ordering allowance, how many cubic yards of bedding aggregate are needed?
A mass excavation produces 1,180 loose cubic yards of material for off-site disposal. End-dump trucks can haul 18 loose cubic yards per trip. What truck count is required?
An asphalt-shingle roof has a slope of 3:12. Under the IBC low-slope asphalt-shingle provisions, what underlayment arrangement is required?
People Also Study
Business & Financial Management
120 questions Β· 70% to pass
Contract Administration
60 questions Β· 70% to pass
Project Management
60 questions Β· 70% to pass