A guardrail section is removed to land materials on an upper floor, and workers continue walking near the open edge after the load is placed. What is the proper response?
Correct Answer
C) Restore the guardrail or provide another compliant fall-protection method before workers remain exposed
When a guardrail is removed, exposure at the edge must be controlled by replacing protection or using another compliant method. Other choices substitute awareness or markings for fall protection.
Why This Is the Correct Answer
When a guardrail is removed, exposure at the edge must be controlled by replacing protection or using another compliant method. Other choices substitute awareness or markings for fall protection.
Why the Other Options Are Wrong
Option A: Leave the opening because the lift is finished
The trap in A is Leave the opening because the lift is finished. That selection is wrong because the option does not produce the required Guardrail interruption outcome, Restore the guardrail or provide another compliant fall-protection method before workers remain exposed.
Option B: Limit guardrail interruption to mark the opening with paint
Choice B gives Mark the opening with paint only. Its specific error: it leaves the work at an informal or incomplete stage, while Guardrail interruption requires Restore the guardrail or provide another compliant fall-protection method before workers remain.
Option D: Ask workers to stay alert until the end of shift
In general project requirements, Ask workers to stay alert until the end of shift is the wrong selection for Guardrail interruption: it leaves out the controlling Guardrail interruption result: Restore the guardrail or provide another compliant fall-protection method before workers remain exposed.
Memory Technique
Tag the scene with guardrail interruption: wrong actor or wrong timing means the fix is not Restore the guardrail or provide another compliant fall-protection method before workers remain exposed.
Reference Hint
Open 29 CFR 1926 OSHA Construction Standards; use 29 CFR 1926.501 and 1926.502 to confirm that When a guardrail is removed, exposure at the edge must be controlled by replacing protection or using another compliant method.
More NASCLA Questions
Bid instructions require bid security with each sealed bid. Which purpose should the estimator associate with that requirement?
A wood deck surface has 320 sf of coverage. Boards have a 5-1/2 in. actual face width, and the order includes an 8 percent cutting allowance. What linear footage is closest?
Using the dimensions shown for the stabilized construction entrance, what is the plan area?
A reroof area requires 14,720 sf of rigid insulation. Boards are 4 ft by 8 ft, and the order includes 5 percent waste. How many boards are needed?
Two addenda revise the drawings before bid day. What must a responsive bidder normally do with those addenda?
A utility trench is 180 ft long, 3 ft wide, and 7 ft deep with vertical sides inside a trench shield. What excavation volume is required?
A 120 ft long Type C trench is cut with a 4 ft bottom width and a 6 ft depth. If side slopes are 1-1/2 horizontal to 1 vertical, what excavation volume is closest?
A storm pipe run needs 240 ft of bedding, 4 ft wide and 6 in. thick. Including a 10 percent ordering allowance, how many cubic yards of bedding aggregate are needed?
A mass excavation produces 1,180 loose cubic yards of material for off-site disposal. End-dump trucks can haul 18 loose cubic yards per trip. What truck count is required?
An asphalt-shingle roof has a slope of 3:12. Under the IBC low-slope asphalt-shingle provisions, what underlayment arrangement is required?
People Also Study
Business & Financial Management
120 questions Β· 70% to pass
Contract Administration
60 questions Β· 70% to pass
Project Management
60 questions Β· 70% to pass