EstatePass
NASCLAGeneral Reqmedium22% of exam part

Heavy rain falls overnight into an open trench. The crew arrives before the planned morning utility work. What should occur before workers enter?

Correct Answer

D) Have the competent person reinspect and correct hazards before entry

Excavations require competent-person inspection after events such as rainstorms that can increase hazard. Other choices rely on stale conditions or put employees into a changed excavation before inspection.

Answer Options
A
Enter if the trench looked safe yesterday
B
Pump water only after employees enter
C
The crew should use the previous week's soil classification without review
D
Have the competent person reinspect and correct hazards before entry

Why This Is the Correct Answer

Excavations require competent-person inspection after events such as rainstorms that can increase hazard. Other choices rely on stale conditions or put employees into a changed excavation before inspection.

Why the Other Options Are Wrong

Option A: Enter if the trench looked safe yesterday

In general project requirements, Enter if the trench looked safe yesterday is the wrong selection for Competent-person inspection: the option does not produce the required Competent-person inspection outcome, Have the competent person reinspect and correct hazards before entry.

Option B: Pump water only after employees enter

The trap in B is Pump water only after employees enter. That selection is wrong because it leaves the work at an informal or incomplete stage, while Competent-person inspection requires Have the competent person reinspect and correct hazards before entry; A competent person inspects excavations after hazard-increasing occurrences such as rainstorms.

Option C: The crew should use the previous week's soil classification without review

Choice C gives Use the previous week's soil classification without review. Its specific error: the option delays or omits the controlling step.

Memory Technique

Remember competent-person inspection by its jobsite consequence: the correct move points to Have the competent person reinspect and correct hazards before entry.

Reference Hint

Open 29 CFR 1926 OSHA Construction Standards; use 29 CFR 1926.651(k)(1) to confirm that Excavations require competent-person inspection after events such as rainstorms that can increase hazard.

Was this explanation helpful?

More NASCLA Questions

People Also Study

Related Study Resources

Practice More Contractor Exam Questions

Access all practice questions with progress tracking and adaptive difficulty to pass your contractor license exam.

Start Practicing

Disclaimer: EstatePass is an independent exam preparation platform and is not affiliated with, endorsed by, or connected to any state contractor licensing board, the Construction Industry Licensing Board (CILB), the Department of Business and Professional Regulation (DBPR), NASCLA, Pearson VUE, PSI, or any government agency. Exam requirements, fees, and regulations change frequently. Always verify current requirements with your state's licensing board before making decisions. Information shown was last verified on the dates indicated and may not reflect the most recent changes.