A temporary stairway has four risers and an open side. Which trigger requires handrail and stairrail protection?
Correct Answer
D) Four or more risers or rising more than 30 in., whichever is less
Stairways with four or more risers or rising more than 30 in., whichever is less, must have the required handrail and stairrail protection. Other choices add thresholds that are not the OSHA construction trigger.
Why This Is the Correct Answer
Stairways with four or more risers or rising more than 30 in., whichever is less, must have the required handrail and stairrail protection. Other choices add thresholds that are not the OSHA construction trigger.
Why the Other Options Are Wrong
Option A: Base the temporary stair handrails response on stairs with ten or more risers
Choice A (Only stairs with ten or more risers) is rejected because it leaves the work at an informal or incomplete stage, while Temporary stair handrails requires F.
Option B: Base the temporary stair handrails response on stairs serving the public only
In general project requirements, Only stairs serving the public is the wrong selection for Temporary stair handrails: the option delays or omits the controlling step.
Option C: Limit temporary stair handrails to stairs wider than 44 in.
The trap in C is Only stairs wider than 44 in. That selection is wrong because Only stairs wider than 44 in. is a different published number than the cited Temporary stair handrails value; 29 CFR 1926.1052(c)(1) supports F.
Memory Technique
Make temporary stair handrails a tabbed card: cite the exact condition, then choose Four or more risers or rising more than 30 in., whichever is less.
Reference Hint
Open 29 CFR 1926 OSHA Construction Standards; use 29 CFR 1926.1052(c)(1) to confirm that Stairways with four or more risers or rising more than 30 in., whichever is less, must have the required handrail and stairrail protection.
More NASCLA Questions
Bid instructions require bid security with each sealed bid. Which purpose should the estimator associate with that requirement?
A wood deck surface has 320 sf of coverage. Boards have a 5-1/2 in. actual face width, and the order includes an 8 percent cutting allowance. What linear footage is closest?
Using the dimensions shown for the stabilized construction entrance, what is the plan area?
A reroof area requires 14,720 sf of rigid insulation. Boards are 4 ft by 8 ft, and the order includes 5 percent waste. How many boards are needed?
Two addenda revise the drawings before bid day. What must a responsive bidder normally do with those addenda?
A utility trench is 180 ft long, 3 ft wide, and 7 ft deep with vertical sides inside a trench shield. What excavation volume is required?
A 120 ft long Type C trench is cut with a 4 ft bottom width and a 6 ft depth. If side slopes are 1-1/2 horizontal to 1 vertical, what excavation volume is closest?
A storm pipe run needs 240 ft of bedding, 4 ft wide and 6 in. thick. Including a 10 percent ordering allowance, how many cubic yards of bedding aggregate are needed?
A mass excavation produces 1,180 loose cubic yards of material for off-site disposal. End-dump trucks can haul 18 loose cubic yards per trip. What truck count is required?
An asphalt-shingle roof has a slope of 3:12. Under the IBC low-slope asphalt-shingle provisions, what underlayment arrangement is required?