A utility trench will be entered by workers and is 5 ft deep in soil that is not stable rock. What cave-in protection threshold applies?
Correct Answer
C) At 5 ft or deeper, a protective system is required unless an allowed exception applies
Excavations 5 ft deep or greater generally require a protective system unless the excavation is entirely in stable rock or another specific exception applies. Other choices confuse the professional-engineer design threshold or omit the 5 ft trigger.
Why This Is the Correct Answer
Excavations 5 ft deep or greater generally require a protective system unless the excavation is entirely in stable rock or another specific exception applies. Other choices confuse the professional-engineer design threshold or omit the 5 ft trigger.
Why the Other Options Are Wrong
Option A: Protection begins only at 8 ft and leave excavation protective systems unchecked
In general project requirements, Protection begins only at 8 ft is the wrong selection for Excavation protective systems: Protection begins only at 8 ft uses the wrong excavation protective-system trigger or exception.
Option B: Protection begins only at 10 ft and use that item to close excavation protective systems
The trap in B is Protection begins only at 10 ft. That selection is wrong because Protection begins only at 10 ft uses the wrong excavation protective-system trigger or exception.
Option D: Classify the condition as a protective system is optional if the trench is less than 20 ft
Choice D (A protective system is optional if the trench is less than 20 ft) is rejected because A protective system is optional if the trench is less than 20 ft uses the wrong excavation protective-system trigger or exception.
Memory Technique
Use a cover note memory cue for excavation protective systems: the stem's condition unlocks At 5 ft or deeper, a protective system is required unless an allowed exception applies.
Reference Hint
Open 29 CFR 1926 OSHA Construction Standards; use 29 CFR 1926.652(a)(1) to confirm that Excavations 5 ft deep or greater generally require a protective system unless the excavation is entirely in stable rock or another specific exception applies.
More NASCLA Questions
Bid instructions require bid security with each sealed bid. Which purpose should the estimator associate with that requirement?
A wood deck surface has 320 sf of coverage. Boards have a 5-1/2 in. actual face width, and the order includes an 8 percent cutting allowance. What linear footage is closest?
Using the dimensions shown for the stabilized construction entrance, what is the plan area?
A reroof area requires 14,720 sf of rigid insulation. Boards are 4 ft by 8 ft, and the order includes 5 percent waste. How many boards are needed?
Two addenda revise the drawings before bid day. What must a responsive bidder normally do with those addenda?
A utility trench is 180 ft long, 3 ft wide, and 7 ft deep with vertical sides inside a trench shield. What excavation volume is required?
A 120 ft long Type C trench is cut with a 4 ft bottom width and a 6 ft depth. If side slopes are 1-1/2 horizontal to 1 vertical, what excavation volume is closest?
A storm pipe run needs 240 ft of bedding, 4 ft wide and 6 in. thick. Including a 10 percent ordering allowance, how many cubic yards of bedding aggregate are needed?
A mass excavation produces 1,180 loose cubic yards of material for off-site disposal. End-dump trucks can haul 18 loose cubic yards per trip. What truck count is required?
An asphalt-shingle roof has a slope of 3:12. Under the IBC low-slope asphalt-shingle provisions, what underlayment arrangement is required?