In an electrical distribution system, what is the main purpose of bonding metal raceways and equipment enclosures?
Correct Answer
B) To establish an effective path for fault current
Bonding connects normally non-current-carrying metal parts so fault current has an effective path back to the source. Other choices confuse bonding with lighting control, voltage transformation, or circuit protection devices.
Why This Is the Correct Answer
Bonding connects normally non-current-carrying metal parts so fault current has an effective path back to the source. Other choices confuse bonding with lighting control, voltage transformation, or circuit protection devices.
Why the Other Options Are Wrong
Option A: Use bonding to reduce lighting fixture brightness
Bonding metal raceways does not control lamp output; lighting brightness is handled by fixture/driver/control design.
Option C: Use bonding to increase transformer voltage
Transformer voltage is changed by transformer design and taps, not by bonding raceways and enclosures.
Option D: Use bonding to replace all overcurrent devices
Bonding helps fault current return to the source, but overcurrent devices are still required to interrupt the fault.
Memory Technique
Make bonding a purpose cue; if the choice changes the purpose, it cannot be To establish an effective path for fault current.
Reference Hint
Open Mechanical and Electrical Systems for Construction Managers, 4th Ed., 2024; use by topic index - grounding / bonding / GFCI / coordination to confirm that Bonding connects normally non-current-carrying metal parts so fault current has an effective path back to the source.
More NASCLA Questions
Bid instructions require bid security with each sealed bid. Which purpose should the estimator associate with that requirement?
A wood deck surface has 320 sf of coverage. Boards have a 5-1/2 in. actual face width, and the order includes an 8 percent cutting allowance. What linear footage is closest?
Using the dimensions shown for the stabilized construction entrance, what is the plan area?
A reroof area requires 14,720 sf of rigid insulation. Boards are 4 ft by 8 ft, and the order includes 5 percent waste. How many boards are needed?
Two addenda revise the drawings before bid day. What must a responsive bidder normally do with those addenda?
A utility trench is 180 ft long, 3 ft wide, and 7 ft deep with vertical sides inside a trench shield. What excavation volume is required?
A 120 ft long Type C trench is cut with a 4 ft bottom width and a 6 ft depth. If side slopes are 1-1/2 horizontal to 1 vertical, what excavation volume is closest?
A storm pipe run needs 240 ft of bedding, 4 ft wide and 6 in. thick. Including a 10 percent ordering allowance, how many cubic yards of bedding aggregate are needed?
A mass excavation produces 1,180 loose cubic yards of material for off-site disposal. End-dump trucks can haul 18 loose cubic yards per trip. What truck count is required?
An asphalt-shingle roof has a slope of 3:12. Under the IBC low-slope asphalt-shingle provisions, what underlayment arrangement is required?
People Also Study
Business & Financial Management
120 questions Β· 70% to pass
Contract Administration
60 questions Β· 70% to pass
Project Management
60 questions Β· 70% to pass