The Deltona job has this respirable-dust condition: dry cutting concrete produces visible dust. Which safety control should be used?
Correct Answer
C) dust-control method
Silica-producing tasks require dust controls and housekeeping methods that reduce exposure.
Why This Is the Correct Answer
Silica-producing tasks require dust controls and housekeeping methods that reduce exposure.
Why the Other Options Are Wrong
Option A: cut faster to beat the dust
cut faster to beat the dust may relate to another site control, but it does not remove or guard the silica exposure control exposure being tested.
Option B: open the doors for airflow
open the doors for airflow may relate to another site control, but it does not remove or guard the silica exposure control exposure being tested.
Option D: wet the floor afterward
wet the floor afterward may relate to another site control, but it does not remove or guard the silica exposure control exposure being tested.
Memory Technique
Name the harm before the guard; cut, faster, beat cannot stand in for Safety Coordinator.
Reference Hint
Open-book path: tab OSHA 29 CFR 1926 to Subpart Z, 1926.1153 Respirable crystalline silica; verify the OSHA safety threshold or jobsite control before answering.
More Project Mgmt Questions
The field condition is: the work should be released only if the team addresses that thermal movement must be accommodated. Which coping joint detail best matches the condition?
From the mechanical schedule, what CFM is listed for DOAS-2?
From panel schedule R1, what wire size is shown for circuit R1-5?
A subcontractor asks for direction after noting that the work should be released only if the team addresses that subgrade and aggregate must remain separated. Which geotextile selection best fits the work?
From the specialty item schedule, what height is listed for SP-3?
Using the drawing index, which sheet should you open for the entry wall footing plan?
From the plumbing fixture schedule, what waste size is listed for UR-1?
A Ocala task creates flying-particle exposure because a worker is cutting masonry. Which PPE control is required?
From the light fixture schedule, what mount is listed for L1?
From the loading strip dimension plan, what perimeter length is needed for edge restraint?
People Also Study
Business & Financial Management
120 questions Β· 70% to pass
Contract Administration
60 questions Β· 70% to pass
Related Study Resources
Previous Question
The Kissimmee project has this cutting/welding condition: combustibles cannot be moved from the area. Which fire-prevention control should be documented?
Next Question
A Bradenton lift plan has this rigging issue: load weight is not confirmed. Which safety action applies before the pick?