The Lake Mary site has this emergency-readiness issue: crew does not know the muster point. Which safety control should be corrected?
Correct Answer
B) emergency action briefing
Emergency planning requires crew communication, access for response, and available contact information.
Why This Is the Correct Answer
Emergency planning requires crew communication, access for response, and available contact information.
More Project Mgmt Questions
The field condition is: the work should be released only if the team addresses that thermal movement must be accommodated. Which coping joint detail best matches the condition?
From the mechanical schedule, what CFM is listed for DOAS-2?
From panel schedule R1, what wire size is shown for circuit R1-5?
A subcontractor asks for direction after noting that the work should be released only if the team addresses that subgrade and aggregate must remain separated. Which geotextile selection best fits the work?
From the specialty item schedule, what height is listed for SP-3?
Using the drawing index, which sheet should you open for the entry wall footing plan?
From the plumbing fixture schedule, what waste size is listed for UR-1?
A Ocala task creates flying-particle exposure because a worker is cutting masonry. Which PPE control is required?
From the light fixture schedule, what mount is listed for L1?
From the loading strip dimension plan, what perimeter length is needed for edge restraint?
People Also Study
Business & Financial Management
120 questions Β· 70% to pass
Contract Administration
60 questions Β· 70% to pass
Related Study Resources
Previous Question
During the field-takeoff reconciliation at the library reading-room addition, a sidewalk cross-slope has a 132 ft run at 1.50% slope. What edge elevation difference is required in inches?
Next Question
At the plant-nursery sales canopy, during the next-week procurement cycle, the metal-deck pins scope includes 154 deck sheets, with 18 fasteners per item. Boxes contain 900 fasteners. How many boxes are needed?