The Palm Coast project has this stairway condition: temporary stairs lack handrail protection. Which safety control applies?
Correct Answer
D) install stair rail system
Stairways and access routes must be kept protected and clear for employee use.
Why This Is the Correct Answer
Stairways and access routes must be kept protected and clear for employee use.
More Project Mgmt Questions
The field condition is: the work should be released only if the team addresses that thermal movement must be accommodated. Which coping joint detail best matches the condition?
From the mechanical schedule, what CFM is listed for DOAS-2?
From panel schedule R1, what wire size is shown for circuit R1-5?
A subcontractor asks for direction after noting that the work should be released only if the team addresses that subgrade and aggregate must remain separated. Which geotextile selection best fits the work?
From the specialty item schedule, what height is listed for SP-3?
Using the drawing index, which sheet should you open for the entry wall footing plan?
From the plumbing fixture schedule, what waste size is listed for UR-1?
A Ocala task creates flying-particle exposure because a worker is cutting masonry. Which PPE control is required?
From the light fixture schedule, what mount is listed for L1?
From the loading strip dimension plan, what perimeter length is needed for edge restraint?
People Also Study
Business & Financial Management
120 questions Β· 70% to pass
Contract Administration
60 questions Β· 70% to pass
Related Study Resources
Previous Question
During the preconstruction estimate lock at the municipal pump-house slab, the canopy deck area for the canopy roof overlay totals 23800 SF. With 8% waste, how many roofing squares are needed?
Next Question
While preparing the crew-release check for the airport service-court canopy, the ready-mix placement includes 45 CY of concrete quantity. Each delivery truck carries 9 CY. How many truckloads are required?