The Daytona Beach project has this confined-space condition: vault may contain hazardous atmosphere. Which safety control should be completed before entry?
Correct Answer
A) atmosphere testing before entry
Confined-space work requires evaluation, atmospheric controls, and rescue planning before entry.
Why This Is the Correct Answer
Confined-space work requires evaluation, atmospheric controls, and rescue planning before entry.
Why the Other Options Are Wrong
Option B: enter and watch for symptoms
enter and watch for symptoms may relate to another site control, but it does not remove or guard the confined-space entry control exposure being tested.
Option C: blow air a minute, then enter
blow air a minute, then enter may relate to another site control, but it does not remove or guard the confined-space entry control exposure being tested.
Option D: test only the top of the space
test only the top of the space may relate to another site control, but it does not remove or guard the confined-space entry control exposure being tested.
Memory Technique
Confined-Space Entry lock for Superintendent Reviews: evaluation is the harm, atmospheric is the guard.
Reference Hint
Open-book path: tab OSHA 29 CFR 1926 to Subpart AA, 1926.1200 Permit-required confined spaces; verify the OSHA safety threshold or jobsite control before answering.
More Project Mgmt Questions
The field condition is: the work should be released only if the team addresses that thermal movement must be accommodated. Which coping joint detail best matches the condition?
From the mechanical schedule, what CFM is listed for DOAS-2?
From panel schedule R1, what wire size is shown for circuit R1-5?
A subcontractor asks for direction after noting that the work should be released only if the team addresses that subgrade and aggregate must remain separated. Which geotextile selection best fits the work?
From the specialty item schedule, what height is listed for SP-3?
Using the drawing index, which sheet should you open for the entry wall footing plan?
From the plumbing fixture schedule, what waste size is listed for UR-1?
A Ocala task creates flying-particle exposure because a worker is cutting masonry. Which PPE control is required?
From the light fixture schedule, what mount is listed for L1?
From the loading strip dimension plan, what perimeter length is needed for edge restraint?
People Also Study
Business & Financial Management
120 questions Β· 70% to pass
Contract Administration
60 questions Β· 70% to pass
Related Study Resources
Previous Question
The work plan must account for this condition: the controlling field constraint is that sound control needs continuous cavity fill. Which insulation placement is most suitable?
Next Question
A Florida superintendent must choose the proper prefabrication coordination because the controlling field constraint is that prefab work must fit real conditions. Which option is best?
