A Stuart trench has a ladder 35 ft from the employee work location. What access status should be reported?
Correct Answer
A) add safe access
Trench access must be located so employees do not travel more than the allowed distance to reach safe egress.
Why This Is the Correct Answer
Trench access must be located so employees do not travel more than the allowed distance to reach safe egress.
More Project Mgmt Questions
The field condition is: the work should be released only if the team addresses that thermal movement must be accommodated. Which coping joint detail best matches the condition?
From the mechanical schedule, what CFM is listed for DOAS-2?
From panel schedule R1, what wire size is shown for circuit R1-5?
A subcontractor asks for direction after noting that the work should be released only if the team addresses that subgrade and aggregate must remain separated. Which geotextile selection best fits the work?
From the specialty item schedule, what height is listed for SP-3?
Using the drawing index, which sheet should you open for the entry wall footing plan?
From the plumbing fixture schedule, what waste size is listed for UR-1?
A Ocala task creates flying-particle exposure because a worker is cutting masonry. Which PPE control is required?
From the light fixture schedule, what mount is listed for L1?
From the loading strip dimension plan, what perimeter length is needed for edge restraint?
People Also Study
Business & Financial Management
120 questions Β· 70% to pass
Contract Administration
60 questions Β· 70% to pass
Related Study Resources
Previous Question
During the pre-installation review, the field issue is that the project condition shows that penetrations are known before pour. Which embedded sleeve coordination is the best match?
Next Question
At the seafood-market cooler room, during the field-takeoff reconciliation, the dry-pack mortar requires 7.6 CY of threshold beds. If each bag yields 0.42 CY, how many bags are needed?