The Wellington site has this scaffold workforce issue: new worker will access supported scaffold. Which record should the PM verify?
Correct Answer
C) scaffold user training
Workers who use, erect, or dismantle scaffolds need training appropriate to the hazards and duties.
Why This Is the Correct Answer
Workers who use, erect, or dismantle scaffolds need training appropriate to the hazards and duties.
Why the Other Options Are Wrong
Option A: a site orientation record
a site orientation record belongs to a different file or record trail; it does not prove the scaffold training records event.
Option B: a prior-employer reference
a prior-employer reference belongs to a different file or record trail; it does not prove the scaffold training records event.
Option D: a signed liability waiver
a signed liability waiver belongs to a different file or record trail; it does not prove the scaffold training records event.
Memory Technique
A record works only when it proves the exact workers event for Checks Documentation.
Reference Hint
Open-book path: tab OSHA 29 CFR 1926 to Subpart L, 1926.454 Training requirements; verify the OSHA safety threshold or jobsite control before answering.
More Project Mgmt Questions
The field condition is: the work should be released only if the team addresses that thermal movement must be accommodated. Which coping joint detail best matches the condition?
From the mechanical schedule, what CFM is listed for DOAS-2?
From panel schedule R1, what wire size is shown for circuit R1-5?
A subcontractor asks for direction after noting that the work should be released only if the team addresses that subgrade and aggregate must remain separated. Which geotextile selection best fits the work?
From the specialty item schedule, what height is listed for SP-3?
Using the drawing index, which sheet should you open for the entry wall footing plan?
From the plumbing fixture schedule, what waste size is listed for UR-1?
A Ocala task creates flying-particle exposure because a worker is cutting masonry. Which PPE control is required?
From the light fixture schedule, what mount is listed for L1?
From the loading strip dimension plan, what perimeter length is needed for edge restraint?