A Jupiter scaffold has this condition: storm winds passed through overnight. Which safety control should occur before employees use it?
Correct Answer
A) post-event scaffold inspection
Scaffolds require competent-person oversight and correction of unsafe changes before use.
Why This Is the Correct Answer
Scaffolds require competent-person oversight and correction of unsafe changes before use.
Why the Other Options Are Wrong
Option B: use it, it survived the storm
use it, it survived the storm may relate to another site control, but it does not remove or guard the scaffold inspection control exposure being tested.
Option C: reset the planks and continue
reset the planks and continue may relate to another site control, but it does not remove or guard the scaffold inspection control exposure being tested.
Option D: inspect todays level only
inspect todays level only may relate to another site control, but it does not remove or guard the scaffold inspection control exposure being tested.
Memory Technique
If Competent Person can still reach the worker, the control is decoration.
Reference Hint
Open-book path: tab OSHA 29 CFR 1926 to Subpart L, 1926.451 Scaffold general requirements; verify the OSHA safety threshold or jobsite control before answering.
More Project Mgmt Questions
The field condition is: the work should be released only if the team addresses that thermal movement must be accommodated. Which coping joint detail best matches the condition?
From the mechanical schedule, what CFM is listed for DOAS-2?
From panel schedule R1, what wire size is shown for circuit R1-5?
A subcontractor asks for direction after noting that the work should be released only if the team addresses that subgrade and aggregate must remain separated. Which geotextile selection best fits the work?
From the specialty item schedule, what height is listed for SP-3?
Using the drawing index, which sheet should you open for the entry wall footing plan?
From the plumbing fixture schedule, what waste size is listed for UR-1?
A Ocala task creates flying-particle exposure because a worker is cutting masonry. Which PPE control is required?
From the light fixture schedule, what mount is listed for L1?
From the loading strip dimension plan, what perimeter length is needed for edge restraint?