A Plant City scaffold has this condition: platform was altered after lunch. Which safety control should occur before employees use it?
Correct Answer
D) competent-person scaffold inspection
Scaffolds require competent-person oversight and correction of unsafe changes before use.
Why This Is the Correct Answer
Scaffolds require competent-person oversight and correction of unsafe changes before use.
Why the Other Options Are Wrong
Option A: let the altering crew use it
let the altering crew use it may relate to another site control, but it does not remove or guard the scaffold inspection control exposure being tested.
Option B: check it from the ground
check it from the ground may relate to another site control, but it does not remove or guard the scaffold inspection control exposure being tested.
Option C: tag and use it till tomorrow
tag and use it till tomorrow may relate to another site control, but it does not remove or guard the scaffold inspection control exposure being tested.
Memory Technique
Name the harm before the guard; let, altering, crew cannot stand in for the controlling choice.
Reference Hint
Open-book path: tab OSHA 29 CFR 1926 to Subpart L, 1926.451 Scaffold general requirements; verify the OSHA safety threshold or jobsite control before answering.
More Project Mgmt Questions
The field condition is: the work should be released only if the team addresses that thermal movement must be accommodated. Which coping joint detail best matches the condition?
From the mechanical schedule, what CFM is listed for DOAS-2?
From panel schedule R1, what wire size is shown for circuit R1-5?
A subcontractor asks for direction after noting that the work should be released only if the team addresses that subgrade and aggregate must remain separated. Which geotextile selection best fits the work?
From the specialty item schedule, what height is listed for SP-3?
Using the drawing index, which sheet should you open for the entry wall footing plan?
From the plumbing fixture schedule, what waste size is listed for UR-1?
A Ocala task creates flying-particle exposure because a worker is cutting masonry. Which PPE control is required?
From the light fixture schedule, what mount is listed for L1?
From the loading strip dimension plan, what perimeter length is needed for edge restraint?