While preparing the buyout verification pass for the performing-arts scene shop, the open ceiling area for dryfall ceiling paint is 10400 SF and requires 2 coats. At 325 SF per gallon, how many gallons are required?
Correct Answer
D) 64 gallons
Gallons equal area times coats divided by coverage, rounded up.
Why This Is the Correct Answer
Gallons equal area times coats divided by coverage, rounded up.
Why the Other Options Are Wrong
Option A: 32 gallons
32 gallons is below the supported result for dryfall ceiling paint; it likely omits allowance, conversion, coverage, or final round-up.
Option B: 56 gallons
56 gallons is below the supported result for dryfall ceiling paint; it likely omits allowance, conversion, coverage, or final round-up.
Option C: 67 gallons
67 gallons is above the supported result for dryfall ceiling paint; it likely double-counts allowance, uses the wrong unit, or rounds too early.
Memory Technique
Measure to controlling, adjust for area, then let Finishes Superintendent set the finish line.
Reference Hint
Open-book path: tab Principles and Practices of Commercial Construction, 10th Edition to Painting; exposed ceiling coverage; verify the construction method, material quantity, equipment use, unit conversion, or field-control calculation.
More Project Mgmt Questions
The field condition is: the work should be released only if the team addresses that thermal movement must be accommodated. Which coping joint detail best matches the condition?
From the mechanical schedule, what CFM is listed for DOAS-2?
From panel schedule R1, what wire size is shown for circuit R1-5?
A subcontractor asks for direction after noting that the work should be released only if the team addresses that subgrade and aggregate must remain separated. Which geotextile selection best fits the work?
From the specialty item schedule, what height is listed for SP-3?
Using the drawing index, which sheet should you open for the entry wall footing plan?
From the plumbing fixture schedule, what waste size is listed for UR-1?
A Ocala task creates flying-particle exposure because a worker is cutting masonry. Which PPE control is required?
From the light fixture schedule, what mount is listed for L1?
From the loading strip dimension plan, what perimeter length is needed for edge restraint?