While preparing the next-week procurement cycle for the museum back-of-house corridor, 22 holes are included in the epoxy dowel installation. At 7.4 labor hours per hole, how many labor hours are budgeted?
Correct Answer
D) 162.8 labor hours
Labor hours equal the number of units times the labor-hour factor per unit.
Why This Is the Correct Answer
Labor hours equal the number of units times the labor-hour factor per unit.
More Project Mgmt Questions
The field condition is: the work should be released only if the team addresses that thermal movement must be accommodated. Which coping joint detail best matches the condition?
From the mechanical schedule, what CFM is listed for DOAS-2?
From panel schedule R1, what wire size is shown for circuit R1-5?
A subcontractor asks for direction after noting that the work should be released only if the team addresses that subgrade and aggregate must remain separated. Which geotextile selection best fits the work?
From the specialty item schedule, what height is listed for SP-3?
Using the drawing index, which sheet should you open for the entry wall footing plan?
From the plumbing fixture schedule, what waste size is listed for UR-1?
A Ocala task creates flying-particle exposure because a worker is cutting masonry. Which PPE control is required?
From the light fixture schedule, what mount is listed for L1?
From the loading strip dimension plan, what perimeter length is needed for edge restraint?
People Also Study
Business & Financial Management
120 questions Β· 70% to pass
Contract Administration
60 questions Β· 70% to pass
Related Study Resources
Previous Question
While preparing the preconstruction estimate lock for the sports-field concession stand, the membrane area for the low-slope recover totals 13720 SF. With 8% waste, how many roofing squares are needed?
Next Question
Before releasing the work, the team identifies this condition: the controlling field constraint is that critical lighting and gloss paint will expose defects. Which finish-level coordination fits best?
