While preparing the buyout verification pass for the fire-station apparatus bay, the stair return run requires 184 LF of handrail tube stock plus 10% waste. Stock comes in 20 ft lengths. How many lengths are required?
Correct Answer
D) 11 lengths
Linear stock count equals required length with waste divided by stock length, rounded up.
Why This Is the Correct Answer
Linear stock count equals required length with waste divided by stock length, rounded up.
More Project Mgmt Questions
The field condition is: the work should be released only if the team addresses that thermal movement must be accommodated. Which coping joint detail best matches the condition?
From the mechanical schedule, what CFM is listed for DOAS-2?
From panel schedule R1, what wire size is shown for circuit R1-5?
A subcontractor asks for direction after noting that the work should be released only if the team addresses that subgrade and aggregate must remain separated. Which geotextile selection best fits the work?
From the specialty item schedule, what height is listed for SP-3?
Using the drawing index, which sheet should you open for the entry wall footing plan?
From the plumbing fixture schedule, what waste size is listed for UR-1?
A Ocala task creates flying-particle exposure because a worker is cutting masonry. Which PPE control is required?
From the light fixture schedule, what mount is listed for L1?
From the loading strip dimension plan, what perimeter length is needed for edge restraint?
People Also Study
Business & Financial Management
120 questions Β· 70% to pass
Contract Administration
60 questions Β· 70% to pass
Related Study Resources
Previous Question
For the crew-release check at the municipal pump-house slab, the mobilization payment shows a $43,500 pay application amount. If 7.5% is withheld, what retainage withheld should be shown?
Next Question
For the subcontractor quantity check at the industrial mezzanine landing, a roofing crew must complete 5050 SF of membrane tear-off area. If planned production is 3360 SF per day, how many whole work days should be scheduled?