During the material-order review at the animal-care kennel addition, the packaging waste produces 79 CY of turnover cleanup volume, with 10% swell or handling allowance. Each container holds 15 CY. How many dumpsters are required?
Correct Answer
A) 6 dumpsters
Container count equals adjusted debris volume divided by container capacity, rounded up.
Why This Is the Correct Answer
Container count equals adjusted debris volume divided by container capacity, rounded up.
Why the Other Options Are Wrong
Option B: 5 dumpsters
5 dumpsters is below the supported result for packaging waste; it likely omits allowance, conversion, coverage, or final round-up.
Option C: 7 dumpsters
7 dumpsters is above the supported result for packaging waste; it likely double-counts allowance, uses the wrong unit, or rounds too early.
Option D: 8 dumpsters
8 dumpsters is above the supported result for packaging waste; it likely double-counts allowance, uses the wrong unit, or rounds too early.
Memory Technique
Superintendent Checks takeoff: count the condition before counting the package Tie the cue to Packaging Waste Superintendent Checks.
Reference Hint
Open-book path: tab Principles and Practices of Commercial Construction, 10th Edition to Project closeout cleanup; dumpster planning; verify the construction method, material quantity, equipment use, unit conversion, or field-control calculation.
More Project Mgmt Questions
The field condition is: the work should be released only if the team addresses that thermal movement must be accommodated. Which coping joint detail best matches the condition?
From the mechanical schedule, what CFM is listed for DOAS-2?
From panel schedule R1, what wire size is shown for circuit R1-5?
A subcontractor asks for direction after noting that the work should be released only if the team addresses that subgrade and aggregate must remain separated. Which geotextile selection best fits the work?
From the specialty item schedule, what height is listed for SP-3?
Using the drawing index, which sheet should you open for the entry wall footing plan?
From the plumbing fixture schedule, what waste size is listed for UR-1?
A Ocala task creates flying-particle exposure because a worker is cutting masonry. Which PPE control is required?
From the light fixture schedule, what mount is listed for L1?
From the loading strip dimension plan, what perimeter length is needed for edge restraint?
People Also Study
Business & Financial Management
120 questions Β· 70% to pass
Contract Administration
60 questions Β· 70% to pass
