During the material-order review at the airport rental-car counter, the patching mortar requires 6.7 CY of spall repair volume. If each bag yields 0.38 CY, how many bags are needed?
Correct Answer
A) 18 bags
Bag count equals required volume divided by bag yield, rounded up.
Why This Is the Correct Answer
Bag count equals required volume divided by bag yield, rounded up.
Why the Other Options Are Wrong
Option B: 3 bags
3 bags is below the supported result for patching mortar; it likely omits allowance, conversion, coverage, or final round-up.
Option C: 20 bags
20 bags is above the supported result for patching mortar; it likely double-counts allowance, uses the wrong unit, or rounds too early.
Option D: 19 bags
19 bags is above the supported result for patching mortar; it likely double-counts allowance, uses the wrong unit, or rounds too early.
Memory Technique
Patching Mortar cart for Foreman Checks: bag first, count second, whole units last.
Reference Hint
Open-book path: tab Principles and Practices of Commercial Construction, 10th Edition to Concrete repair; patch material yield; verify the construction method, material quantity, equipment use, unit conversion, or field-control calculation.
More Project Mgmt Questions
The field condition is: the work should be released only if the team addresses that thermal movement must be accommodated. Which coping joint detail best matches the condition?
From the mechanical schedule, what CFM is listed for DOAS-2?
From panel schedule R1, what wire size is shown for circuit R1-5?
A subcontractor asks for direction after noting that the work should be released only if the team addresses that subgrade and aggregate must remain separated. Which geotextile selection best fits the work?
From the specialty item schedule, what height is listed for SP-3?
Using the drawing index, which sheet should you open for the entry wall footing plan?
From the plumbing fixture schedule, what waste size is listed for UR-1?
A Ocala task creates flying-particle exposure because a worker is cutting masonry. Which PPE control is required?
From the light fixture schedule, what mount is listed for L1?
From the loading strip dimension plan, what perimeter length is needed for edge restraint?
People Also Study
Business & Financial Management
120 questions Β· 70% to pass
Contract Administration
60 questions Β· 70% to pass
Related Study Resources
Previous Question
During the next-week procurement cycle at the civic-center ticket lobby, the membrane area for the low-slope recover totals 13240 SF. With 5% waste, how many roofing squares are needed?
Next Question
Before the inspection hold point, the team confirms that the work should be released only if the team addresses that clean aggregate base must be densified efficiently. Which compaction equipment is appropriate?