During the subcontractor quantity check at the retail demising-wall phase, the interior pit perimeter requires 144 LF of pit-wall forms at 2.0 ft high on 2 sides. What contact area is required?
Correct Answer
A) 576 SF
Form contact area equals length times height times the number of formed sides.
Why This Is the Correct Answer
Form contact area equals length times height times the number of formed sides.
Why the Other Options Are Wrong
Option B: 288 SF
288 SF is below the supported result for pit-wall forms; it likely omits allowance, conversion, coverage, or final round-up.
Option C: 720 SF
720 SF is above the supported result for pit-wall forms; it likely double-counts allowance, uses the wrong unit, or rounds too early.
Option D: 577 SF
577 SF is above the supported result for pit-wall forms; it likely double-counts allowance, uses the wrong unit, or rounds too early.
Memory Technique
Pit-Wall Forms cart for Concrete Foreman: form first, contact second, whole sf last.
Reference Hint
Open-book path: tab Principles and Practices of Commercial Construction, 10th Edition to Concrete formwork; pit wall forms; verify the construction method, material quantity, equipment use, unit conversion, or field-control calculation.
More Project Mgmt Questions
The field condition is: the work should be released only if the team addresses that thermal movement must be accommodated. Which coping joint detail best matches the condition?
From the mechanical schedule, what CFM is listed for DOAS-2?
From panel schedule R1, what wire size is shown for circuit R1-5?
A subcontractor asks for direction after noting that the work should be released only if the team addresses that subgrade and aggregate must remain separated. Which geotextile selection best fits the work?
From the specialty item schedule, what height is listed for SP-3?
Using the drawing index, which sheet should you open for the entry wall footing plan?
From the plumbing fixture schedule, what waste size is listed for UR-1?
A Ocala task creates flying-particle exposure because a worker is cutting masonry. Which PPE control is required?
From the light fixture schedule, what mount is listed for L1?
From the loading strip dimension plan, what perimeter length is needed for edge restraint?
People Also Study
Business & Financial Management
120 questions Β· 70% to pass
Contract Administration
60 questions Β· 70% to pass
