During the look-ahead planning meeting at the athletic-locker shower bay, the pedestal order includes 204 pedestals at $8 each before a 8% contractor markup. What extended price should be carried?
Correct Answer
B) $1,763
Extended price equals quantity times unit price, then multiplied by the markup factor.
Why This Is the Correct Answer
Extended price equals quantity times unit price, then multiplied by the markup factor.
More Project Mgmt Questions
The field condition is: the work should be released only if the team addresses that thermal movement must be accommodated. Which coping joint detail best matches the condition?
From the mechanical schedule, what CFM is listed for DOAS-2?
From panel schedule R1, what wire size is shown for circuit R1-5?
A subcontractor asks for direction after noting that the work should be released only if the team addresses that subgrade and aggregate must remain separated. Which geotextile selection best fits the work?
From the specialty item schedule, what height is listed for SP-3?
Using the drawing index, which sheet should you open for the entry wall footing plan?
From the plumbing fixture schedule, what waste size is listed for UR-1?
A Ocala task creates flying-particle exposure because a worker is cutting masonry. Which PPE control is required?
From the light fixture schedule, what mount is listed for L1?
From the loading strip dimension plan, what perimeter length is needed for edge restraint?
People Also Study
Business & Financial Management
120 questions Β· 70% to pass
Contract Administration
60 questions Β· 70% to pass
Related Study Resources
Previous Question
The field condition is: the work should be released only if the team addresses that temporary stability depends on brace design. Which panel bracing method best matches the condition?
Next Question
During the field-takeoff reconciliation at the pharmacy tenant improvement, the parapet return face measures 6284 SF before a 10% waste allowance. Each sheathing sheet covers 40 SF. How many sheets should be ordered?