During the preconstruction estimate lock at the community-pool bathhouse, 54 frames are included in the ceiling cloud framing. At 2.2 labor hours per frame, how many labor hours are budgeted?
Correct Answer
D) 118.8 labor hours
Labor hours equal the number of units times the labor-hour factor per unit.
Why This Is the Correct Answer
Labor hours equal the number of units times the labor-hour factor per unit.
Why the Other Options Are Wrong
Option A: 24.5 labor hours
24.5 labor hours is below the supported result for ceiling cloud framing; it likely skips a premium-pay or employer-cost component.
Option B: 140.4 labor hours
140.4 labor hours is above the supported result for ceiling cloud framing; it likely pays the wrong premium tier or counts the same hours twice.
Option C: 101.0 labor hours
101.0 labor hours is below the supported result for ceiling cloud framing; it likely skips a premium-pay or employer-cost component.
Memory Technique
Ceiling ladder for Manager Checks: hours climb before dollars add up.
Reference Hint
Open-book path: tab Principles and Practices of Commercial Construction, 10th Edition to Interior ceiling methods; specialty framing labor; verify the construction method, material quantity, equipment use, unit conversion, or field-control calculation.
More Project Mgmt Questions
The field condition is: the work should be released only if the team addresses that thermal movement must be accommodated. Which coping joint detail best matches the condition?
From the mechanical schedule, what CFM is listed for DOAS-2?
From panel schedule R1, what wire size is shown for circuit R1-5?
A subcontractor asks for direction after noting that the work should be released only if the team addresses that subgrade and aggregate must remain separated. Which geotextile selection best fits the work?
From the specialty item schedule, what height is listed for SP-3?
Using the drawing index, which sheet should you open for the entry wall footing plan?
From the plumbing fixture schedule, what waste size is listed for UR-1?
A Ocala task creates flying-particle exposure because a worker is cutting masonry. Which PPE control is required?
From the light fixture schedule, what mount is listed for L1?
From the loading strip dimension plan, what perimeter length is needed for edge restraint?