At the dental-clinic sterilization room, during the buyout verification pass, a accessible ramp has a 48 ft run at 8.33% slope. What rise over the run is required in inches?
Correct Answer
B) 48.0 in.
Convert run to inches and multiply by the slope percentage expressed as a decimal.
Why This Is the Correct Answer
Convert run to inches and multiply by the slope percentage expressed as a decimal.
More Project Mgmt Questions
The field condition is: the work should be released only if the team addresses that thermal movement must be accommodated. Which coping joint detail best matches the condition?
From the mechanical schedule, what CFM is listed for DOAS-2?
From panel schedule R1, what wire size is shown for circuit R1-5?
A subcontractor asks for direction after noting that the work should be released only if the team addresses that subgrade and aggregate must remain separated. Which geotextile selection best fits the work?
From the specialty item schedule, what height is listed for SP-3?
Using the drawing index, which sheet should you open for the entry wall footing plan?
From the plumbing fixture schedule, what waste size is listed for UR-1?
A Ocala task creates flying-particle exposure because a worker is cutting masonry. Which PPE control is required?
From the light fixture schedule, what mount is listed for L1?
From the loading strip dimension plan, what perimeter length is needed for edge restraint?
People Also Study
Business & Financial Management
120 questions Β· 70% to pass
Contract Administration
60 questions Β· 70% to pass
Related Study Resources
Previous Question
At the grocery receiving dock, during the subcontractor quantity check, the deck repair area for plywood roof sheathing is 9040 SF. With 12% waste and 32 SF per sheet or panel, how many sheets are required?
Next Question
During the buyout verification pass at the clinic oxygen-storage pad, the canopy fascia edge requires 261 LF of fiber-cement trim plus 8% waste. Stock comes in 12 ft boards. How many boards are required?