At the senior-center activity hall, during the next-week procurement cycle, the overhead pipe rack is 186 ft long and hangers are placed at 8 ft on center, including one at the starting end. How many hangers are needed?
Correct Answer
B) 24 hangers
Count the spaces along the run, then include the starting item.
Why This Is the Correct Answer
Count the spaces along the run, then include the starting item.
Why the Other Options Are Wrong
Option A: 23 hangers
23 hangers is below the supported result for hanger layout; it likely uses the wrong base, period, or account bucket.
Option C: 25 hangers
25 hangers is above the supported result for hanger layout; it likely adds an unsupported amount or compares the wrong financial base.
Option D: 26 hangers
26 hangers is above the supported result for hanger layout; it likely adds an unsupported amount or compares the wrong financial base.
Memory Technique
Hanger Layout drawer for Foreman Checks: label count before counting dollars.
Reference Hint
Open-book path: tab Principles and Practices of Commercial Construction, 10th Edition to Mechanical support methods; hanger spacing; verify the construction method, material quantity, equipment use, unit conversion, or field-control calculation.
More Project Mgmt Questions
The field condition is: the work should be released only if the team addresses that thermal movement must be accommodated. Which coping joint detail best matches the condition?
From the mechanical schedule, what CFM is listed for DOAS-2?
From panel schedule R1, what wire size is shown for circuit R1-5?
A subcontractor asks for direction after noting that the work should be released only if the team addresses that subgrade and aggregate must remain separated. Which geotextile selection best fits the work?
From the specialty item schedule, what height is listed for SP-3?
Using the drawing index, which sheet should you open for the entry wall footing plan?
From the plumbing fixture schedule, what waste size is listed for UR-1?
A Ocala task creates flying-particle exposure because a worker is cutting masonry. Which PPE control is required?
From the light fixture schedule, what mount is listed for L1?
From the loading strip dimension plan, what perimeter length is needed for edge restraint?
People Also Study
Business & Financial Management
120 questions Β· 70% to pass
Contract Administration
60 questions Β· 70% to pass