At the water-treatment control room, during the preconstruction estimate lock, the dock apron slot requires 541 LF of trench drain frame plus 6% waste. Stock comes in 8 ft sections. How many sections are required?
Correct Answer
C) 72 sections
Linear stock count equals required length with waste divided by stock length, rounded up.
Why This Is the Correct Answer
Linear stock count equals required length with waste divided by stock length, rounded up.
Why the Other Options Are Wrong
Option A: 68 sections
68 sections is below the supported result for trench drain frame; it likely omits allowance, conversion, coverage, or final round-up.
Option B: 76 sections
76 sections is above the supported result for trench drain frame; it likely double-counts allowance, uses the wrong unit, or rounds too early.
Option D: 71 sections
71 sections is below the supported result for trench drain frame; it likely omits allowance, conversion, coverage, or final round-up.
Memory Technique
Trench Drain Frame cart for Field Engineer: linear first, stock second, whole units last.
Reference Hint
Open-book path: tab Principles and Practices of Commercial Construction, 10th Edition to Specialty drainage; modular frame sections; verify the construction method, material quantity, equipment use, unit conversion, or field-control calculation.
More Project Mgmt Questions
The field condition is: the work should be released only if the team addresses that thermal movement must be accommodated. Which coping joint detail best matches the condition?
From the mechanical schedule, what CFM is listed for DOAS-2?
From panel schedule R1, what wire size is shown for circuit R1-5?
A subcontractor asks for direction after noting that the work should be released only if the team addresses that subgrade and aggregate must remain separated. Which geotextile selection best fits the work?
From the specialty item schedule, what height is listed for SP-3?
Using the drawing index, which sheet should you open for the entry wall footing plan?
From the plumbing fixture schedule, what waste size is listed for UR-1?
A Ocala task creates flying-particle exposure because a worker is cutting masonry. Which PPE control is required?
From the light fixture schedule, what mount is listed for L1?
From the loading strip dimension plan, what perimeter length is needed for edge restraint?