At the retail demising-wall phase, during the material-order review, the parapet return face measures 4062 SF before a 7% waste allowance. Each sheathing sheet covers 40 SF. How many sheets should be ordered?
Correct Answer
D) 109 sheets
Order quantity equals area times waste factor divided by 40 SF coverage, rounded up.
Why This Is the Correct Answer
Order quantity equals area times waste factor divided by 40 SF coverage, rounded up.
Why the Other Options Are Wrong
Option A: 102 sheets
102 sheets is below the supported result for exterior gypsum sheathing; it likely omits allowance, conversion, coverage, or final round-up.
Option B: 114 sheets
114 sheets is above the supported result for exterior gypsum sheathing; it likely double-counts allowance, uses the wrong unit, or rounds too early.
Option C: 112 sheets
112 sheets is above the supported result for exterior gypsum sheathing; it likely double-counts allowance, uses the wrong unit, or rounds too early.
Memory Technique
Measure to area, adjust for times, then let Estimator Checks set the finish line.
Reference Hint
Open-book path: tab Principles and Practices of Commercial Construction, 10th Edition to Exterior wall assemblies; sheathing quantity takeoff; verify the construction method, material quantity, equipment use, unit conversion, or field-control calculation.
More Project Mgmt Questions
The field condition is: the work should be released only if the team addresses that thermal movement must be accommodated. Which coping joint detail best matches the condition?
From the mechanical schedule, what CFM is listed for DOAS-2?
From panel schedule R1, what wire size is shown for circuit R1-5?
A subcontractor asks for direction after noting that the work should be released only if the team addresses that subgrade and aggregate must remain separated. Which geotextile selection best fits the work?
From the specialty item schedule, what height is listed for SP-3?
Using the drawing index, which sheet should you open for the entry wall footing plan?
From the plumbing fixture schedule, what waste size is listed for UR-1?
A Ocala task creates flying-particle exposure because a worker is cutting masonry. Which PPE control is required?
From the light fixture schedule, what mount is listed for L1?
From the loading strip dimension plan, what perimeter length is needed for edge restraint?