For the next-week procurement cycle at the plant-nursery sales canopy, the kitchen floor area for quarry tile is 2555 SF, with 15% attic stock and waste. A carton covers 22 SF. How many cartons should be ordered?
Correct Answer
A) 134 cartons
Carton quantity equals adjusted floor or ceiling area divided by carton coverage, rounded up.
Why This Is the Correct Answer
Carton quantity equals adjusted floor or ceiling area divided by carton coverage, rounded up.
Why the Other Options Are Wrong
Option B: 116 cartons
116 cartons is below the supported result for quarry tile; it likely omits allowance, conversion, coverage, or final round-up.
Option C: 139 cartons
139 cartons is above the supported result for quarry tile; it likely double-counts allowance, uses the wrong unit, or rounds too early.
Option D: 132 cartons
132 cartons is below the supported result for quarry tile; it likely omits allowance, conversion, coverage, or final round-up.
Memory Technique
Finishes Estimator takeoff: count the condition before counting the package Tie the cue to Quarry Tile Finishes Estimator.
Reference Hint
Open-book path: tab Principles and Practices of Commercial Construction, 10th Edition to Tile; carton coverage and waste; verify the construction method, material quantity, equipment use, unit conversion, or field-control calculation.
More Project Mgmt Questions
The field condition is: the work should be released only if the team addresses that thermal movement must be accommodated. Which coping joint detail best matches the condition?
From the mechanical schedule, what CFM is listed for DOAS-2?
From panel schedule R1, what wire size is shown for circuit R1-5?
A subcontractor asks for direction after noting that the work should be released only if the team addresses that subgrade and aggregate must remain separated. Which geotextile selection best fits the work?
From the specialty item schedule, what height is listed for SP-3?
Using the drawing index, which sheet should you open for the entry wall footing plan?
From the plumbing fixture schedule, what waste size is listed for UR-1?
A Ocala task creates flying-particle exposure because a worker is cutting masonry. Which PPE control is required?
From the light fixture schedule, what mount is listed for L1?
From the loading strip dimension plan, what perimeter length is needed for edge restraint?