For the look-ahead planning meeting at the warehouse battery room, the partition side area for gypsum board layer is 1920 SF. With 12% waste and 32 SF per sheet or panel, how many sheets are required?
Correct Answer
D) 68 sheets
Sheet count equals area with waste divided by coverage per sheet or panel, rounded up.
Why This Is the Correct Answer
Sheet count equals area with waste divided by coverage per sheet or panel, rounded up.
Why the Other Options Are Wrong
Option A: 60 sheets
60 sheets is below the supported result for gypsum board layer; it likely omits allowance, conversion, coverage, or final round-up.
Option B: 34 sheets
34 sheets is below the supported result for gypsum board layer; it likely omits allowance, conversion, coverage, or final round-up.
Option C: 72 sheets
72 sheets is above the supported result for gypsum board layer; it likely double-counts allowance, uses the wrong unit, or rounds too early.
Memory Technique
Measure to sheet, adjust for count, then let Carpenter Checks set the finish line.
Reference Hint
Open-book path: tab Principles and Practices of Commercial Construction, 10th Edition to Drywall; board count estimating; verify the construction method, material quantity, equipment use, unit conversion, or field-control calculation.
More Project Mgmt Questions
The field condition is: the work should be released only if the team addresses that thermal movement must be accommodated. Which coping joint detail best matches the condition?
From the mechanical schedule, what CFM is listed for DOAS-2?
From panel schedule R1, what wire size is shown for circuit R1-5?
A subcontractor asks for direction after noting that the work should be released only if the team addresses that subgrade and aggregate must remain separated. Which geotextile selection best fits the work?
From the specialty item schedule, what height is listed for SP-3?
Using the drawing index, which sheet should you open for the entry wall footing plan?
From the plumbing fixture schedule, what waste size is listed for UR-1?
A Ocala task creates flying-particle exposure because a worker is cutting masonry. Which PPE control is required?
From the light fixture schedule, what mount is listed for L1?
From the loading strip dimension plan, what perimeter length is needed for edge restraint?