For the material-order review at the shipping-office break area, the dry-pack mortar requires 31.2 CY of threshold beds. If each bag yields 0.42 CY, how many bags are needed?
Correct Answer
C) 75 bags
Bag count equals required volume divided by bag yield, rounded up.
Why This Is the Correct Answer
Bag count equals required volume divided by bag yield, rounded up.
Why the Other Options Are Wrong
Option A: 74 bags
74 bags is below the supported result for dry-pack mortar; it likely omits allowance, conversion, coverage, or final round-up.
Option B: 13 bags
13 bags is below the supported result for dry-pack mortar; it likely omits allowance, conversion, coverage, or final round-up.
Option D: 77 bags
77 bags is above the supported result for dry-pack mortar; it likely double-counts allowance, uses the wrong unit, or rounds too early.
Memory Technique
Dry-Pack Mortar cart for Foreman Checks: bag first, count second, whole units last.
Reference Hint
Open-book path: tab Principles and Practices of Commercial Construction, 10th Edition to Masonry and tile prep; dry-pack yield; verify the construction method, material quantity, equipment use, unit conversion, or field-control calculation.
More Project Mgmt Questions
The field condition is: the work should be released only if the team addresses that thermal movement must be accommodated. Which coping joint detail best matches the condition?
From the mechanical schedule, what CFM is listed for DOAS-2?
From panel schedule R1, what wire size is shown for circuit R1-5?
A subcontractor asks for direction after noting that the work should be released only if the team addresses that subgrade and aggregate must remain separated. Which geotextile selection best fits the work?
From the specialty item schedule, what height is listed for SP-3?
Using the drawing index, which sheet should you open for the entry wall footing plan?
From the plumbing fixture schedule, what waste size is listed for UR-1?
A Ocala task creates flying-particle exposure because a worker is cutting masonry. Which PPE control is required?
From the light fixture schedule, what mount is listed for L1?
From the loading strip dimension plan, what perimeter length is needed for edge restraint?