For the preconstruction estimate lock at the airport service-court canopy, the slab edge requires 376 LF of thickened-edge forms at 2.5 ft high on 1 side. What contact area is required?
Correct Answer
B) 940 SF
Form contact area equals length times height times the number of formed sides.
Why This Is the Correct Answer
Form contact area equals length times height times the number of formed sides.
Why the Other Options Are Wrong
Option A: 376 SF
376 SF is below the supported result for thickened-edge forms; it likely omits allowance, conversion, coverage, or final round-up.
Option C: 1,175 SF
1,175 SF is above the supported result for thickened-edge forms; it likely double-counts allowance, uses the wrong unit, or rounds too early.
Option D: 941 SF
941 SF is above the supported result for thickened-edge forms; it likely double-counts allowance, uses the wrong unit, or rounds too early.
Memory Technique
Concrete Foreman takeoff: count the condition before counting the package.
Reference Hint
Open-book path: tab Principles and Practices of Commercial Construction, 10th Edition to Concrete slab forming; edge form area; verify the construction method, material quantity, equipment use, unit conversion, or field-control calculation.
More Project Mgmt Questions
The field condition is: the work should be released only if the team addresses that thermal movement must be accommodated. Which coping joint detail best matches the condition?
From the mechanical schedule, what CFM is listed for DOAS-2?
From panel schedule R1, what wire size is shown for circuit R1-5?
A subcontractor asks for direction after noting that the work should be released only if the team addresses that subgrade and aggregate must remain separated. Which geotextile selection best fits the work?
From the specialty item schedule, what height is listed for SP-3?
Using the drawing index, which sheet should you open for the entry wall footing plan?
From the plumbing fixture schedule, what waste size is listed for UR-1?
A Ocala task creates flying-particle exposure because a worker is cutting masonry. Which PPE control is required?
From the light fixture schedule, what mount is listed for L1?
From the loading strip dimension plan, what perimeter length is needed for edge restraint?
People Also Study
Business & Financial Management
120 questions Β· 70% to pass
Contract Administration
60 questions Β· 70% to pass
Related Study Resources
Previous Question
At the library reading-room addition, during the look-ahead planning meeting, the concrete washout solids produces 67 CY of solid waste volume, with 0% swell or handling allowance. Each container holds 10 CY. How many containers are required?
Next Question
A Fort Myers crew will work at an unprotected roof edge 6 ft above the lower level. Which control should be in place before work begins?