For the next-week procurement cycle at the warehouse fire-pump room, the interior pit perimeter requires 392 LF of pit-wall forms at 3.0 ft high on 2 sides. What contact area is required?
Correct Answer
A) 2,352 SF
Form contact area equals length times height times the number of formed sides.
Why This Is the Correct Answer
Form contact area equals length times height times the number of formed sides.
More Project Mgmt Questions
The field condition is: the work should be released only if the team addresses that thermal movement must be accommodated. Which coping joint detail best matches the condition?
From the mechanical schedule, what CFM is listed for DOAS-2?
From panel schedule R1, what wire size is shown for circuit R1-5?
A subcontractor asks for direction after noting that the work should be released only if the team addresses that subgrade and aggregate must remain separated. Which geotextile selection best fits the work?
From the specialty item schedule, what height is listed for SP-3?
Using the drawing index, which sheet should you open for the entry wall footing plan?
From the plumbing fixture schedule, what waste size is listed for UR-1?
A Ocala task creates flying-particle exposure because a worker is cutting masonry. Which PPE control is required?
From the light fixture schedule, what mount is listed for L1?
From the area summary schedule, what occupancy is listed for Zone D?
People Also Study
Business & Financial Management
120 questions Β· 70% to pass
Contract Administration
60 questions Β· 70% to pass
Related Study Resources
Previous Question
At the visitor-center exhibit wall, during the look-ahead planning meeting, a thickened concrete pad is 54 ft by 10 ft by 6 in. Including 7% waste, how many cubic yards of concrete are needed?
Next Question
The field condition is: the project condition shows that the base cannot sit directly below the work. Which access equipment best matches the condition?