For the material-order review at the bank drive-through canopy, the planter-wall back face measures 3975 SF before a 7% waste allowance. Each protection-board panel covers 24 SF. How many panels should be ordered?
Correct Answer
C) 178 panels
Order quantity equals area times waste factor divided by 24 SF coverage, rounded up.
Why This Is the Correct Answer
Order quantity equals area times waste factor divided by 24 SF coverage, rounded up.
Why the Other Options Are Wrong
Option A: 166 panels
166 panels is below the supported result for waterproofing protection board; it likely uses the wrong base, period, or account bucket.
Option B: 186 panels
186 panels is above the supported result for waterproofing protection board; it likely adds an unsupported amount or compares the wrong financial base.
Option D: 179 panels
179 panels is above the supported result for waterproofing protection board; it likely adds an unsupported amount or compares the wrong financial base.
Memory Technique
Estimator Checks money test: bucket before math for waterproofing.
Reference Hint
Open-book path: tab Principles and Practices of Commercial Construction, 10th Edition to Waterproofing methods; protection board coverage; verify the construction method, material quantity, equipment use, unit conversion, or field-control calculation.
More Project Mgmt Questions
The field condition is: the work should be released only if the team addresses that thermal movement must be accommodated. Which coping joint detail best matches the condition?
From the mechanical schedule, what CFM is listed for DOAS-2?
From panel schedule R1, what wire size is shown for circuit R1-5?
A subcontractor asks for direction after noting that the work should be released only if the team addresses that subgrade and aggregate must remain separated. Which geotextile selection best fits the work?
From the specialty item schedule, what height is listed for SP-3?
Using the drawing index, which sheet should you open for the entry wall footing plan?
From the plumbing fixture schedule, what waste size is listed for UR-1?
A Ocala task creates flying-particle exposure because a worker is cutting masonry. Which PPE control is required?
From the light fixture schedule, what mount is listed for L1?
From the loading strip dimension plan, what perimeter length is needed for edge restraint?
People Also Study
Business & Financial Management
120 questions Β· 70% to pass
Contract Administration
60 questions Β· 70% to pass