During the pre-installation review, the field issue is that the work should be released only if the team addresses that flooring and substrate require listed adhesive compatibility. Which floor adhesive is the best match?
Correct Answer
B) Coordinate manufacturer-approved adhesive
manufacturer-approved adhesive best matches the stated condition. The other choices are real construction options in the same family, but they fit different field conditions.
Why This Is the Correct Answer
manufacturer-approved adhesive best matches the stated condition. The other choices are real construction options in the same family, but they fit different field conditions.
Why the Other Options Are Wrong
Option A: Coordinate general construction adhesive
Coordinate general construction adhesive addresses a neighboring field issue, but not the condition or method control required for flooring adhesive selection.
Option C: Coordinate water-based adhesive despite moisture limit
Coordinate water-based adhesive despite moisture limit addresses a neighboring field issue, but not the condition or method control required for flooring adhesive selection.
Option D: Coordinate pressure-sensitive adhesive for wrong backing
Coordinate pressure-sensitive adhesive for wrong backing addresses a neighboring field issue, but not the condition or method control required for flooring adhesive selection.
Memory Technique
The field condition asks; flooring adhesive answers in work boots for Manager Checking.
Reference Hint
Open-book path: tab Principles and Practices of Commercial Construction, 10th Edition to Flooring materials; adhesive compatibility with substrate and flooring; verify the construction method, material selection, equipment choice, or work sequence that fits the field condition.
More Project Mgmt Questions
The field condition is: the work should be released only if the team addresses that thermal movement must be accommodated. Which coping joint detail best matches the condition?
From the mechanical schedule, what CFM is listed for DOAS-2?
From panel schedule R1, what wire size is shown for circuit R1-5?
A subcontractor asks for direction after noting that the work should be released only if the team addresses that subgrade and aggregate must remain separated. Which geotextile selection best fits the work?
From the specialty item schedule, what height is listed for SP-3?
Using the drawing index, which sheet should you open for the entry wall footing plan?
From the plumbing fixture schedule, what waste size is listed for UR-1?
A Ocala task creates flying-particle exposure because a worker is cutting masonry. Which PPE control is required?
From the light fixture schedule, what mount is listed for L1?
From the loading strip dimension plan, what perimeter length is needed for edge restraint?
People Also Study
Business & Financial Management
120 questions Β· 70% to pass
Contract Administration
60 questions Β· 70% to pass
Related Study Resources
Previous Question
At the marina restroom shell, during the material-order review, the paver delivery includes 105 pallets of palletized pavers. Each delivery truck carries 18 pallets. How many truckloads are required?
Next Question
While preparing the material-order review for the maintenance-shop wash bay, a sloped landing slab is 72 ft by 20 ft by 4 in. Including 5% waste, how many cubic yards of concrete are needed?