On this project, the controlling condition is the work should be released only if the team addresses that the base cannot sit directly below the work. Which access equipment should be selected?
Correct Answer
C) Coordinate articulating boom lift
articulating boom lift best matches the stated condition. The other choices are real construction options in the same family, but they fit different field conditions.
Why This Is the Correct Answer
articulating boom lift best matches the stated condition. The other choices are real construction options in the same family, but they fit different field conditions.
Why the Other Options Are Wrong
Option A: Coordinate scissor lift
Coordinate scissor lift addresses a neighboring field issue, but not the condition or method control required for boom lift access.
Option B: Coordinate mast lift
Coordinate mast lift addresses a neighboring field issue, but not the condition or method control required for boom lift access.
Option D: Equipment choice: Coordinate fixed scaffold bay
Equipment choice: Coordinate fixed scaffold bay addresses a neighboring field issue, but not the condition or method control required for boom lift access.
Memory Technique
the controlling choice Access method for Foreman Selecting: condition first, tool second.
Reference Hint
Open-book path: tab Principles and Practices of Commercial Construction, 10th Edition to Tools and equipment; boom lift selection for outreach; verify the construction method, material selection, equipment choice, or work sequence that fits the field condition.
More Project Mgmt Questions
The field condition is: the work should be released only if the team addresses that thermal movement must be accommodated. Which coping joint detail best matches the condition?
From the mechanical schedule, what CFM is listed for DOAS-2?
From panel schedule R1, what wire size is shown for circuit R1-5?
A subcontractor asks for direction after noting that the work should be released only if the team addresses that subgrade and aggregate must remain separated. Which geotextile selection best fits the work?
From the specialty item schedule, what height is listed for SP-3?
Using the drawing index, which sheet should you open for the entry wall footing plan?
From the plumbing fixture schedule, what waste size is listed for UR-1?
A Ocala task creates flying-particle exposure because a worker is cutting masonry. Which PPE control is required?
From the light fixture schedule, what mount is listed for L1?
From the loading strip dimension plan, what perimeter length is needed for edge restraint?
People Also Study
Business & Financial Management
120 questions Β· 70% to pass
Contract Administration
60 questions Β· 70% to pass
Related Study Resources
Previous Question
During the pre-installation review, the field issue is that the project condition shows that shrinkage cracking needs controlled relief. Which joint timing method is the best match?
Next Question
For the upcoming operation, the key field fact is that the work should be released only if the team addresses that vertical transition must be watertight. Which flashing sequence should govern the choice?