On this project, the controlling condition is the work should be released only if the team addresses that preservative-treated lumber is exposed outside. Which fastener selection should be selected?
Correct Answer
A) Coordinate compatible corrosion-resistant fasteners
compatible corrosion-resistant fasteners best matches the stated condition. The other choices are real construction options in the same family, but they fit different field conditions.
Why This Is the Correct Answer
compatible corrosion-resistant fasteners best matches the stated condition. The other choices are real construction options in the same family, but they fit different field conditions.
Why the Other Options Are Wrong
Option B: Coordinate ordinary bright common nails
Coordinate ordinary bright common nails addresses a neighboring field issue, but not the condition or method control required for treated lumber fastening.
Option C: Coordinate interior electro-galvanized finish nails
Coordinate interior electro-galvanized finish nails addresses a neighboring field issue, but not the condition or method control required for treated lumber fastening.
Option D: Coordinate coarse-thread drywall screws
Coordinate coarse-thread drywall screws addresses a neighboring field issue, but not the condition or method control required for treated lumber fastening.
Memory Technique
Treated Lumber Fastening method for Foreman Selecting: condition first, tool second.
Reference Hint
Open-book path: tab Principles and Practices of Commercial Construction, 10th Edition to Carpentry materials; preservative-treated lumber and fastener compatibility; verify the construction method, material selection, equipment choice, or work sequence that fits the field condition.
More Project Mgmt Questions
The field condition is: the work should be released only if the team addresses that thermal movement must be accommodated. Which coping joint detail best matches the condition?
From the mechanical schedule, what CFM is listed for DOAS-2?
From panel schedule R1, what wire size is shown for circuit R1-5?
A subcontractor asks for direction after noting that the work should be released only if the team addresses that subgrade and aggregate must remain separated. Which geotextile selection best fits the work?
From the specialty item schedule, what height is listed for SP-3?
Using the drawing index, which sheet should you open for the entry wall footing plan?
From the plumbing fixture schedule, what waste size is listed for UR-1?
A Ocala task creates flying-particle exposure because a worker is cutting masonry. Which PPE control is required?
From the light fixture schedule, what mount is listed for L1?
From the loading strip dimension plan, what perimeter length is needed for edge restraint?
People Also Study
Business & Financial Management
120 questions Β· 70% to pass
Contract Administration
60 questions Β· 70% to pass
Related Study Resources
Previous Question
During the material-order review at the marina restroom shell, a rough-terrain forklift is needed for pallet staging for 13 days at $410 per day, plus a $85 delivery charge. What rental cost should be budgeted?
Next Question
At the warehouse battery room, during the field-takeoff reconciliation, the gypsum board delivery includes 179 bundles of drywall bundles. Each delivery truck carries 24 bundles. How many truckloads are required?