A Florida superintendent must choose the proper reinforcing method because the controlling field constraint is that bar continuity must meet detail. Which option is best?
Correct Answer
B) Select specified lap or mechanical splice
specified lap or mechanical splice best matches the stated condition. The other choices are real construction options in the same family, but they fit different field conditions.
Why This Is the Correct Answer
specified lap or mechanical splice best matches the stated condition. The other choices are real construction options in the same family, but they fit different field conditions.
Why the Other Options Are Wrong
Option A: Select random butt joint
Select random butt joint relies on the wrong note, symbol, sheet, scale, or detail path for rebar splicing.
Option C: Select welded splice without approval
Select welded splice without approval relies on the wrong note, symbol, sheet, scale, or detail path for rebar splicing.
Option D: Select wire tie treated as structural splice
Select wire tie treated as structural splice relies on the wrong note, symbol, sheet, scale, or detail path for rebar splicing.
Memory Technique
Rebar Splicing trail for Foreman Selecting: note to schedule to detail, then field action.
Reference Hint
Open-book path: tab Principles and Practices of Commercial Construction, 10th Edition to Reinforcing steel methods; lap and mechanical splicing; verify the construction method, material selection, equipment choice, or work sequence that fits the field condition.
More Project Mgmt Questions
The field condition is: the work should be released only if the team addresses that thermal movement must be accommodated. Which coping joint detail best matches the condition?
From the mechanical schedule, what CFM is listed for DOAS-2?
From panel schedule R1, what wire size is shown for circuit R1-5?
A subcontractor asks for direction after noting that the work should be released only if the team addresses that subgrade and aggregate must remain separated. Which geotextile selection best fits the work?
From the specialty item schedule, what height is listed for SP-3?
Using the drawing index, which sheet should you open for the entry wall footing plan?
From the plumbing fixture schedule, what waste size is listed for UR-1?
A Ocala task creates flying-particle exposure because a worker is cutting masonry. Which PPE control is required?
From the light fixture schedule, what mount is listed for L1?
From the loading strip dimension plan, what perimeter length is needed for edge restraint?
People Also Study
Business & Financial Management
120 questions Β· 70% to pass
Contract Administration
60 questions Β· 70% to pass
Related Study Resources
Previous Question
A Fort Myers crew will work at an unprotected roof edge 6 ft above the lower level. Which control should be in place before work begins?
Next Question
At the hotel pool-equipment yard, during the next-week procurement cycle, a ride-on sweeper is needed for warehouse turnover cleaning for 14 days at $225 per day, plus a $145 delivery charge. What rental cost should be budgeted?