A Florida superintendent must choose the proper equipment pad method because the controlling field constraint is that bonded pad needs surface preparation. Which option is best?
Correct Answer
D) Select roughen and clean slab before bonded pad
roughen and clean slab before bonded pad best matches the stated condition. The other choices are real construction options in the same family, but they fit different field conditions.
Why This Is the Correct Answer
roughen and clean slab before bonded pad best matches the stated condition. The other choices are real construction options in the same family, but they fit different field conditions.
Why the Other Options Are Wrong
Option A: Select cast pad over dust and curing residue
Select cast pad over dust and curing residue addresses a neighboring field issue, but not the condition or method control required for housekeeping pad prep.
Option B: Select set anchor bolts after equipment is placed
Select set anchor bolts after equipment is placed addresses a neighboring field issue, but not the condition or method control required for housekeeping pad prep.
Option C: Select use sealant as pad leveling compound
Select use sealant as pad leveling compound addresses a neighboring field issue, but not the condition or method control required for housekeeping pad prep.
Memory Technique
The field condition asks; housekeeping pad prep answers in work boots for Foreman Selecting.
Reference Hint
Open-book path: tab Principles and Practices of Commercial Construction, 10th Edition to Concrete methods; equipment housekeeping pads; verify the construction method, material selection, equipment choice, or work sequence that fits the field condition.
More Project Mgmt Questions
The field condition is: the work should be released only if the team addresses that thermal movement must be accommodated. Which coping joint detail best matches the condition?
From the mechanical schedule, what CFM is listed for DOAS-2?
From panel schedule R1, what wire size is shown for circuit R1-5?
A subcontractor asks for direction after noting that the work should be released only if the team addresses that subgrade and aggregate must remain separated. Which geotextile selection best fits the work?
From the specialty item schedule, what height is listed for SP-3?
Using the drawing index, which sheet should you open for the entry wall footing plan?
From the plumbing fixture schedule, what waste size is listed for UR-1?
A Ocala task creates flying-particle exposure because a worker is cutting masonry. Which PPE control is required?
From the light fixture schedule, what mount is listed for L1?
From the loading strip dimension plan, what perimeter length is needed for edge restraint?
People Also Study
Business & Financial Management
120 questions Β· 70% to pass
Contract Administration
60 questions Β· 70% to pass
Related Study Resources
Previous Question
While preparing the buyout verification pass for the museum back-of-house corridor, the deck repair area for plywood roof sheathing is 5200 SF. With 7% waste and 32 SF per sheet or panel, how many sheets are required?
Next Question
From the window schedule, what glass type is scheduled for W302?