During the pre-installation review, the field issue is that the project condition shows that predecessors must be ready. Which work-release condition is the best match?
Correct Answer
C) Use release crew after predecessor work is accepted
release crew after predecessor work is accepted best matches the stated condition. The other choices are real construction options in the same family, but they fit different field conditions.
Why This Is the Correct Answer
release crew after predecessor work is accepted best matches the stated condition. The other choices are real construction options in the same family, but they fit different field conditions.
Why the Other Options Are Wrong
Option A: Field method: Use start production while layout is unresolved
Field method: Use start production while layout is unresolved skips the written authority, scope, price, notice, or release control needed for crew production release.
Option B: Use mobilize crew before materials are approved
Use mobilize crew before materials are approved skips the written authority, scope, price, notice, or release control needed for crew production release.
Option D: Use proceed before mockup acceptance
Use proceed before mockup acceptance skips the written authority, scope, price, notice, or release control needed for crew production release.
Memory Technique
Crew Production Release square for Foreman Selecting: scope, authority, price, paper.
Reference Hint
Open-book path: tab Principles and Practices of Commercial Construction, 10th Edition to Construction methods; production release and predecessor checks; verify the construction method, material selection, equipment choice, or work sequence that fits the field condition.
More Project Mgmt Questions
The field condition is: the work should be released only if the team addresses that thermal movement must be accommodated. Which coping joint detail best matches the condition?
From the mechanical schedule, what CFM is listed for DOAS-2?
From panel schedule R1, what wire size is shown for circuit R1-5?
A subcontractor asks for direction after noting that the work should be released only if the team addresses that subgrade and aggregate must remain separated. Which geotextile selection best fits the work?
From the specialty item schedule, what height is listed for SP-3?
Using the drawing index, which sheet should you open for the entry wall footing plan?
From the plumbing fixture schedule, what waste size is listed for UR-1?
A Ocala task creates flying-particle exposure because a worker is cutting masonry. Which PPE control is required?
From the light fixture schedule, what mount is listed for L1?
From the loading strip dimension plan, what perimeter length is needed for edge restraint?
People Also Study
Business & Financial Management
120 questions Β· 70% to pass
Contract Administration
60 questions Β· 70% to pass
Related Study Resources
Previous Question
For the preconstruction estimate lock at the community-pool bathhouse, the stair return run requires 107 LF of handrail tube stock plus 10% waste. Stock comes in 20 ft lengths. How many lengths are required?
Next Question
From the finish matrix, what base finish is listed for room 803?