For the upcoming operation, the key field fact is that the project condition shows that sediment must be kept out of inlet. Which site-control material should govern the choice?
Correct Answer
B) Use inlet protection device maintained during work
inlet protection device maintained during work best matches the stated condition. The other choices are real construction options in the same family, but they fit different field conditions.
Why This Is the Correct Answer
inlet protection device maintained during work best matches the stated condition. The other choices are real construction options in the same family, but they fit different field conditions.
More Project Mgmt Questions
The field condition is: the work should be released only if the team addresses that thermal movement must be accommodated. Which coping joint detail best matches the condition?
From the mechanical schedule, what CFM is listed for DOAS-2?
From panel schedule R1, what wire size is shown for circuit R1-5?
A subcontractor asks for direction after noting that the work should be released only if the team addresses that subgrade and aggregate must remain separated. Which geotextile selection best fits the work?
From the specialty item schedule, what height is listed for SP-3?
Using the drawing index, which sheet should you open for the entry wall footing plan?
From the plumbing fixture schedule, what waste size is listed for UR-1?
A Ocala task creates flying-particle exposure because a worker is cutting masonry. Which PPE control is required?
From the light fixture schedule, what mount is listed for L1?
From the loading strip dimension plan, what perimeter length is needed for edge restraint?
People Also Study
Business & Financial Management
120 questions Β· 70% to pass
Contract Administration
60 questions Β· 70% to pass
Related Study Resources
Previous Question
During the buyout verification pass at the school band-room storage, the ready-mix placement includes 120 CY of concrete quantity. Each delivery truck carries 9 CY. How many truckloads are required?
Next Question
While preparing the material-order review for the police evidence-processing room, the roof plane area for the shingle reroof totals 11560 SF. With 15% waste, how many roofing squares are needed?
