Project MgmtConstructionmedium63% of exam part

On this project, the controlling condition is the project condition shows that water pressure requires waterproofing. Which moisture-protection selection should be selected?

Correct Answer

B) Use waterproofing system for hydrostatic risk

waterproofing system for hydrostatic risk best matches the stated condition. The other choices are real construction options in the same family, but they fit different field conditions.

Answer Options
A
Use dampproofing only where water pressure exists
B
Use waterproofing system for hydrostatic risk
C
Use paint primer as below-grade protection
D
Use air barrier membrane used as footing waterproofing

Why This Is the Correct Answer

waterproofing system for hydrostatic risk best matches the stated condition. The other choices are real construction options in the same family, but they fit different field conditions.

Was this explanation helpful?

More Project Mgmt Questions

People Also Study

Related Study Resources

Practice More Contractor Exam Questions

Access all practice questions with progress tracking and adaptive difficulty to pass your Florida General Contractor exam.

Start Practicing

Disclaimer: EstatePass is an independent exam preparation platform and is not affiliated with, endorsed by, or connected to any state contractor licensing board, the Construction Industry Licensing Board (CILB), the Department of Business and Professional Regulation (DBPR), NASCLA, Pearson VUE, PSI, or any government agency. Exam requirements, fees, and regulations change frequently. Always verify current requirements with your state's licensing board before making decisions. Information shown was last verified on the dates indicated and may not reflect the most recent changes.