On this project, the controlling condition is the project condition shows that track needs mechanical attachment. Which partition fastening method should be selected?
Correct Answer
B) Use specified track fasteners to substrate
specified track fasteners to substrate best matches the stated condition. The other choices are real construction options in the same family, but they fit different field conditions.
Why This Is the Correct Answer
specified track fasteners to substrate best matches the stated condition. The other choices are real construction options in the same family, but they fit different field conditions.
Why the Other Options Are Wrong
Option A: Use construction adhesive only under track
Use construction adhesive only under track addresses a neighboring field issue, but not the condition or method control required for metal stud track fastening.
Option C: Use finish nails through track
Use finish nails through track addresses a neighboring field issue, but not the condition or method control required for metal stud track fastening.
Option D: Use loose track held by board sheets
Use loose track held by board sheets addresses a neighboring field issue, but not the condition or method control required for metal stud track fastening.
Memory Technique
Metal Stud Track method for Manager Checking: condition first, tool second.
Reference Hint
Open-book path: tab Principles and Practices of Commercial Construction, 10th Edition to Interior framing methods; metal stud track attachment; verify the construction method, material selection, equipment choice, or work sequence that fits the field condition.
More Project Mgmt Questions
The field condition is: the work should be released only if the team addresses that thermal movement must be accommodated. Which coping joint detail best matches the condition?
From the mechanical schedule, what CFM is listed for DOAS-2?
From panel schedule R1, what wire size is shown for circuit R1-5?
A subcontractor asks for direction after noting that the work should be released only if the team addresses that subgrade and aggregate must remain separated. Which geotextile selection best fits the work?
From the specialty item schedule, what height is listed for SP-3?
Using the drawing index, which sheet should you open for the entry wall footing plan?
From the plumbing fixture schedule, what waste size is listed for UR-1?
A Ocala task creates flying-particle exposure because a worker is cutting masonry. Which PPE control is required?
From the light fixture schedule, what mount is listed for L1?
From the loading strip dimension plan, what perimeter length is needed for edge restraint?
People Also Study
Business & Financial Management
120 questions Β· 70% to pass
Contract Administration
60 questions Β· 70% to pass
Related Study Resources
Previous Question
The field condition is: the project condition shows that curb alignment must be controlled. Which site concrete forming method best matches the condition?
Next Question
While preparing the field-takeoff reconciliation for the medical-office imaging room, the cricket infill zone measures 911 SF before a 9% waste allowance. Each insulation board covers 32 SF. How many boards should be ordered?