Before the inspection hold point, the team confirms that the project condition shows that panel must release from casting slab. Which bond breaker material is appropriate?
Correct Answer
B) Use compatible tilt-up bond breaker
compatible tilt-up bond breaker best matches the stated condition. The other choices are real construction options in the same family, but they fit different field conditions.
Why This Is the Correct Answer
compatible tilt-up bond breaker best matches the stated condition. The other choices are real construction options in the same family, but they fit different field conditions.
Why the Other Options Are Wrong
Option A: Use ordinary form oil on casting slab
Use ordinary form oil on casting slab skips the written authority, scope, price, notice, or release control needed for tilt-up bond breaker.
Option C: Use curing compound incompatible with panels
Use curing compound incompatible with panels skips the written authority, scope, price, notice, or release control needed for tilt-up bond breaker.
Option D: Use paint primer under panel face
Use paint primer under panel face skips the written authority, scope, price, notice, or release control needed for tilt-up bond breaker.
Memory Technique
Contract square for Manager Checking: scope, authority, price, paper.
Reference Hint
Open-book path: tab Principles and Practices of Commercial Construction, 10th Edition to Tilt-up methods; casting slab bond breaker; verify the construction method, material selection, equipment choice, or work sequence that fits the field condition.
More Project Mgmt Questions
The field condition is: the work should be released only if the team addresses that thermal movement must be accommodated. Which coping joint detail best matches the condition?
From the mechanical schedule, what CFM is listed for DOAS-2?
From panel schedule R1, what wire size is shown for circuit R1-5?
A subcontractor asks for direction after noting that the work should be released only if the team addresses that subgrade and aggregate must remain separated. Which geotextile selection best fits the work?
From the specialty item schedule, what height is listed for SP-3?
Using the drawing index, which sheet should you open for the entry wall footing plan?
From the plumbing fixture schedule, what waste size is listed for UR-1?
A Ocala task creates flying-particle exposure because a worker is cutting masonry. Which PPE control is required?
From the light fixture schedule, what mount is listed for L1?
From the loading strip dimension plan, what perimeter length is needed for edge restraint?
People Also Study
Business & Financial Management
120 questions Β· 70% to pass
Contract Administration
60 questions Β· 70% to pass
Related Study Resources
Previous Question
While preparing the crew-release check for the manufacturing clean-room chase, the wrapped panel area for acoustic wall fabric is 15480 SF and the order includes 0% waste. How many square yards are required?
Next Question
The field condition is: the project condition shows that curb alignment must be controlled. Which site concrete forming method best matches the condition?