For the upcoming operation, the key field fact is that the project condition shows that loads must be redistributed safely. Which reshoring method should govern the choice?
Correct Answer
B) Use planned reshoring sequence
planned reshoring sequence best matches the stated condition. The other choices are real construction options in the same family, but they fit different field conditions.
Why This Is the Correct Answer
planned reshoring sequence best matches the stated condition. The other choices are real construction options in the same family, but they fit different field conditions.
Why the Other Options Are Wrong
Option A: Use backshoring below a loaded bay
Use backshoring below a loaded bay addresses a neighboring field issue, but not the condition or method control required for reshoring sequence.
Option C: Use reshore layout revised by the engineer
Use reshore layout revised by the engineer addresses a neighboring field issue, but not the condition or method control required for reshoring sequence.
Option D: Use shore removal after strength and load checks
Use shore removal after strength and load checks addresses a neighboring field issue, but not the condition or method control required for reshoring sequence.
Memory Technique
Controlling is the clue; condition is the method check for Manager Checking Tie the cue to Manager Checking Material Method.
Reference Hint
Open-book path: tab Principles and Practices of Commercial Construction, 10th Edition to Concrete frame methods; reshoring and load path; verify the construction method, material selection, equipment choice, or work sequence that fits the field condition.
More Project Mgmt Questions
The field condition is: the work should be released only if the team addresses that thermal movement must be accommodated. Which coping joint detail best matches the condition?
From the mechanical schedule, what CFM is listed for DOAS-2?
From panel schedule R1, what wire size is shown for circuit R1-5?
A subcontractor asks for direction after noting that the work should be released only if the team addresses that subgrade and aggregate must remain separated. Which geotextile selection best fits the work?
From the specialty item schedule, what height is listed for SP-3?
Using the drawing index, which sheet should you open for the entry wall footing plan?
From the plumbing fixture schedule, what waste size is listed for UR-1?
A Ocala task creates flying-particle exposure because a worker is cutting masonry. Which PPE control is required?
From the light fixture schedule, what mount is listed for L1?
From the loading strip dimension plan, what perimeter length is needed for edge restraint?
People Also Study
Business & Financial Management
120 questions Β· 70% to pass
Contract Administration
60 questions Β· 70% to pass