The work plan must account for this condition: pavers need uniform bedding and restraint. Which unit paving material is most suitable?
Correct Answer
A) specified bedding sand with edge restraint
specified bedding sand with edge restraint best matches the stated condition. The other choices are real construction options in the same family, but they fit different field conditions.
Why This Is the Correct Answer
specified bedding sand with edge restraint best matches the stated condition. The other choices are real construction options in the same family, but they fit different field conditions.
Why the Other Options Are Wrong
Option B: topsoil setting bed under pavers
topsoil setting bed under pavers puts the item in the wrong financial bucket, timing, base, or comparison for paver base setting bed.
Option C: Material choice: mortar spot bedding over flexible base
Material choice: mortar spot bedding over flexible base puts the item in the wrong financial bucket, timing, base, or comparison for paver base setting bed.
Option D: loose pavers with no edge restraint
loose pavers with no edge restraint puts the item in the wrong financial bucket, timing, base, or comparison for paver base setting bed.
Memory Technique
An unlabeled Manager Checking dollar tells the wrong story.
Reference Hint
Open-book path: tab Principles and Practices of Commercial Construction, 10th Edition to Unit paving methods; setting bed and edge restraint; verify the construction method, material selection, equipment choice, or work sequence that fits the field condition.
More Project Mgmt Questions
The field condition is: the work should be released only if the team addresses that thermal movement must be accommodated. Which coping joint detail best matches the condition?
From the mechanical schedule, what CFM is listed for DOAS-2?
From panel schedule R1, what wire size is shown for circuit R1-5?
A subcontractor asks for direction after noting that the work should be released only if the team addresses that subgrade and aggregate must remain separated. Which geotextile selection best fits the work?
From the specialty item schedule, what height is listed for SP-3?
Using the drawing index, which sheet should you open for the entry wall footing plan?
From the plumbing fixture schedule, what waste size is listed for UR-1?
A Ocala task creates flying-particle exposure because a worker is cutting masonry. Which PPE control is required?
From the light fixture schedule, what mount is listed for L1?
From the loading strip dimension plan, what perimeter length is needed for edge restraint?
People Also Study
Business & Financial Management
120 questions Β· 70% to pass
Contract Administration
60 questions Β· 70% to pass
Related Study Resources
Previous Question
During the pre-installation review, the field issue is that the project condition shows that unpaved site delivery is expected. Which forklift selection is the best match?
Next Question
The construction team is coordinating a method decision because the controlling field constraint is that a rooftop unit will cross an occupied zone. Which hoisting-planning item is best?