The construction team is coordinating a method decision because prefab work must fit real conditions. Which prefabrication coordination is best?
Correct Answer
B) field measurements before fabrication
field measurements before fabrication best matches the stated condition. The other choices are real construction options in the same family, but they fit different field conditions.
Why This Is the Correct Answer
field measurements before fabrication best matches the stated condition. The other choices are real construction options in the same family, but they fit different field conditions.
Why the Other Options Are Wrong
Option A: fabricate from schematic dimensions only
fabricate from schematic dimensions only addresses a neighboring field issue, but not the condition or method control required for prefab coordination.
Option C: ship modules before opening verification
ship modules before opening verification addresses a neighboring field issue, but not the condition or method control required for prefab coordination.
Option D: ignore tolerance stack-up
ignore tolerance stack-up addresses a neighboring field issue, but not the condition or method control required for prefab coordination.
Memory Technique
Prefab Coordination method for Foreman Selecting: condition first, tool second.
Reference Hint
Open-book path: tab Principles and Practices of Commercial Construction, 10th Edition to Construction methods; prefabrication and field verification; verify the construction method, material selection, equipment choice, or work sequence that fits the field condition.
More Project Mgmt Questions
The field condition is: the work should be released only if the team addresses that thermal movement must be accommodated. Which coping joint detail best matches the condition?
From the mechanical schedule, what CFM is listed for DOAS-2?
From panel schedule R1, what wire size is shown for circuit R1-5?
A subcontractor asks for direction after noting that the work should be released only if the team addresses that subgrade and aggregate must remain separated. Which geotextile selection best fits the work?
From the specialty item schedule, what height is listed for SP-3?
Using the drawing index, which sheet should you open for the entry wall footing plan?
From the plumbing fixture schedule, what waste size is listed for UR-1?
A Ocala task creates flying-particle exposure because a worker is cutting masonry. Which PPE control is required?
From the light fixture schedule, what mount is listed for L1?
From the loading strip dimension plan, what perimeter length is needed for edge restraint?
People Also Study
Business & Financial Management
120 questions Β· 70% to pass
Contract Administration
60 questions Β· 70% to pass
Related Study Resources
Previous Question
The foreman is preparing the next work area, and the controlling field constraint is that higher lateral load and exterior exposure are expected. Which mortar type should be used?
Next Question
For the field-takeoff reconciliation at the medical-office imaging room, the metal-deck pins scope includes 462 deck sheets, with 18 fasteners per item. Boxes contain 900 fasteners. How many boxes are needed?