The work plan must account for this condition: unknown utilities must be verified. Which subsurface utility method is most suitable?
Correct Answer
C) locate and pothole before excavation
locate and pothole before excavation best matches the stated condition. The other choices are real construction options in the same family, but they fit different field conditions.
Why This Is the Correct Answer
locate and pothole before excavation best matches the stated condition. The other choices are real construction options in the same family, but they fit different field conditions.
Why the Other Options Are Wrong
Option A: electronic utility locating
electronic utility locating puts the item in the wrong financial bucket, timing, base, or comparison for utility locating.
Option B: vacuum potholing at crossings
vacuum potholing at crossings puts the item in the wrong financial bucket, timing, base, or comparison for utility locating.
Option D: surveyed utility markout before layout
surveyed utility markout before layout puts the item in the wrong financial bucket, timing, base, or comparison for utility locating.
Memory Technique
Utility Locating ledger for Manager Checking: put controlling in the right drawer.
Reference Hint
Open-book path: tab Principles and Practices of Commercial Construction, 10th Edition to Sitework methods; utility locating and potholing; verify the construction method, material selection, equipment choice, or work sequence that fits the field condition.
More Project Mgmt Questions
The field condition is: the work should be released only if the team addresses that thermal movement must be accommodated. Which coping joint detail best matches the condition?
From the mechanical schedule, what CFM is listed for DOAS-2?
From panel schedule R1, what wire size is shown for circuit R1-5?
A subcontractor asks for direction after noting that the work should be released only if the team addresses that subgrade and aggregate must remain separated. Which geotextile selection best fits the work?
From the specialty item schedule, what height is listed for SP-3?
Using the drawing index, which sheet should you open for the entry wall footing plan?
From the plumbing fixture schedule, what waste size is listed for UR-1?
A Ocala task creates flying-particle exposure because a worker is cutting masonry. Which PPE control is required?
From the light fixture schedule, what mount is listed for L1?
From the loading strip dimension plan, what perimeter length is needed for edge restraint?
People Also Study
Business & Financial Management
120 questions Β· 70% to pass
Contract Administration
60 questions Β· 70% to pass
Related Study Resources
Previous Question
While preparing the field-takeoff reconciliation for the library reading-room addition, the deck area for the temporary dry-in totals 7720 SF. With 10% waste, how many roofing squares are needed?
Next Question
The Stuart job has this respirable-dust condition: worker uses handheld grinder on masonry. Which safety control should be used?